Inspection Status: Not Ready
Inspection History: RSBU - Building Final
| Date |
Description |
Inspector |
Results |
Comments |
| 10/27/2022 |
RSBU - Building Final |
|
Not Ready |
|
| 04/27/2023 |
RSBU - Building Final |
|
Not Ready |
Not ready. Laundry room need to be GFCI. Outdoor receptacles are loose need to be secured with center screw. PRV needs to be 6" above grade. Clean outs need to be cut to grade. Secondary line for condensation is dripping. Condenser lines need to be UV taped. 4/27/2023 |
| 05/02/2023 |
RSBU - Building Final |
|
Passed |
Approved. Corrections were made. 5/2/2023 |