Permit: T22CM03072

Parcel: 11804197D

Inspection Status: Not Ready

Inspection History: RSBU - Building Final 

Date Description Inspector Results Comments
10/27/2022 RSBU - Building Final  Not Ready
06/14/2023 RSBU - Building Final  Not Ready Number to reach customer was not complete. Need access to the site. 6/14/2023
06/15/2023 RSBU - Building Final  Partial Pass Partial pass. Pending electrical panel being labeled and a lock installed for water heater breaker. 6/15/2023
06/16/2023 RSBU - Building Final  Passed