Inspection History Details
Inspection Status: Not Ready
Inspection History: ENGR Engineering Final
Permit Number - T22CM02988
Inspection Description - ENGR Engineering Final
Inspection Status - Not Ready
Date | Description | Inspector | Results | Comments |
---|---|---|---|---|
10/27/2022 | ENGR Engineering Final | Not Ready | ||
08/30/2023 | ENGR Engineering Final | Partial Pass | level one TC OF O. For stocking and plants splash pads, riprap need to be completed. | |
09/27/2023 | ENGR Engineering Final | Partial Pass | need to install the splash pads from the roof drain in the back of the building. OK for T.C.O. LEVEL 4 | |
09/28/2023 | ENGR Engineering Final | Partial Pass | Need to create a swale from roof drain to West wall weep drainage block and remove landscape rock and dirt from weep block for drainage. | |
10/04/2023 | ENGR Engineering Final | Partial Pass | OK FOUR LEVEL FOUR 2-49 the entrance of the project need to be redone the handicap parking need to be redone the catch basin need to be look at by surveyors it looks like bust.the roof drain need to be lowered,the trash roll-off need to be removed. | |
11/27/2023 | ENGR Engineering Final | Passed |