Inspection History Details
Inspection Status: Approved
Inspection History: PLUMBING - ROUGH, SOIL
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 05/20/2022 | PLUMBING - ROUGH, SOIL | Approved | Approved, debris and boulders removed & proper fill and layment provided onsite. | |
| 05/19/2022 | PLUMBING - ROUGH, SOIL | Correction Required | . CO 1. Remove all rocks and clods from trench 2. Install grey water location per plan with required 2 clean-outs 3. Install string lines between property pins |