Inspection History Details
Inspection Status: Not Ready
Inspection History: COT - RSBU - Residential Intermediate may include Framing, Electrical, Plumbing, HVAC and/or Mechanical work. Only one inspection may be attached for all trades for final rough-in.
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 10/26/2022 | COT - RSBU - Residential Intermediate may include Framing, Electrical, Plumbing, HVAC and/or Mechanical work. Only one inspection may be attached for all trades for final rough-in. | Not Ready | ||
| 02/13/2023 | COT - RSBU - Residential Intermediate may include Framing, Electrical, Plumbing, HVAC and/or Mechanical work. Only one inspection may be attached for all trades for final rough-in. | Passed | exhaust fan for bathroom is installed. bathroom exterior wall is framed and lighting receptacles are install. Okay to hang sheet rock on interior walls. | |
| 12/16/2022 | COT - RSBU - Residential Intermediate may include Framing, Electrical, Plumbing, HVAC and/or Mechanical work. Only one inspection may be attached for all trades for final rough-in. | Partial Pass | 1-Need to install exhaust fan in bathroom. 2-Per owner-builder, switch and receptacle in bathroom will be surface mounted er Code. Also power for mini-splits will be surface mounted per Code. OK to proceed elsewhere, call for re-inspection of these items when completed. |