Inspection History Details
Inspection Status: Approved
Inspection History: ELECTRIC - FINAL
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 06/24/2022 | ELECTRIC - FINAL | Approved | Approved, please send DGC Clearance to TEP for the solar meter | |
| 06/20/2022 | ELECTRIC - FINAL | Cancelled | ca When recalling inspection: Please leave message for the inspector with the name and phone # of the Tech on site for the virtual inspection. |