Inspection History Details
Inspection Status: Not Ready
Inspection History: COT - LCEL - Electrical Underground
Permit Number - T22CM02636
Inspection Description - COT - LCEL - Electrical Underground
Inspection Status - Not Ready
Date | Description | Inspector | Results | Comments |
---|---|---|---|---|
10/26/2022 | COT - LCEL - Electrical Underground | Not Ready | ||
04/14/2023 | COT - LCEL - Electrical Underground | Partial Pass | ||
04/19/2023 | COT - LCEL - Electrical Underground | Partial Pass | ||
04/20/2023 | COT - LCEL - Electrical Underground | Partial Pass | ||
04/21/2023 | COT - LCEL - Electrical Underground | Canceled | 4/3/23 - Partial for water pump, pending pipe and system testing 4/21/23: contractor called to cancel inspection. |
|
04/25/2023 | COT - LCEL - Electrical Underground | Partial Pass | 4/14/23 - Partial for underground conduit from Pole B-1 heading north to within 60' of Pole A-1 location, okay to backfill progress areas - TG 4/19/23 - Partial underground up to Pole A-1, okay to backfill progress areas 4/20/23 - Partial underground conduit from the Pole B-2 location heading east to the Pole A-2 location, okay to backfill progress areas4/3/23 - Partial for water pump, pending pipe and system testing 4/25/23: all underground conduit behind the ball field backstop approved to cover 4/21/23: contractor called to cancel inspection. |
|
05/08/2023 | COT - LCEL - Electrical Underground | Passed |