Inspection Status: Not Ready
Inspection History: COT - RSPL - Plumbing Final
| Date |
Description |
Inspector |
Results |
Comments |
| 10/27/2022 |
COT - RSPL - Plumbing Final |
|
Not Ready |
|
| 04/08/2022 |
COT - RSPL - Plumbing Final |
VVERA |
Prior to Final Inspectn |
Entered by VVERA1 - A Pima County Wastewater sign off required prior to issuance of final status.
|
| 04/07/2022 |
COT - RSPL - Plumbing Final |
JG3 |
Prior to Final Inspectn |
Entered by JGARCIA1 - Bldgs 26, 27, 28, 29, 30 and 31 will be served by same water meter. Verify PC connection fees have been paid prior to FINAL |
| 09/12/2023 |
COT - RSPL - Plumbing Final |
|
Re-inspection required |
9/12/23:AC unit breaker requires 45-50Amp, AC unit disconnect fuses min 45Amp, Secure and seal all roof jacks. Vacuum breaker on hose bib missing. |
| 09/14/2023 |
COT - RSPL - Plumbing Final |
|
Passed |
9/14/23: Level 4 TCO |