Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you can not find what you are looking for please submit a records request.
Inspection History Details
Inspection Status: Not Ready
Inspection History: COT - RSBU - Residential Intermediate may include Framing, Electrical, Plumbing, and/or Mechanical work. Only one inspection may be attached for all trades for final rough-in.
Permit Number - T22CM02376
Inspection Description - COT - RSBU - Residential Intermediate may include Framing, Electrical, Plumbing, and/or Mechanical work. Only one inspection may be attached for all trades for final rough-in.
Inspection Status - Not Ready
Date | Description | Inspector | Results | Comments |
---|---|---|---|---|
10/26/2022 | COT - RSBU - Residential Intermediate may include Framing, Electrical, Plumbing, and/or Mechanical work. Only one inspection may be attached for all trades for final rough-in. | Not Ready | ||
04/07/2023 | COT - RSBU - Residential Intermediate may include Framing, Electrical, Plumbing, and/or Mechanical work. Only one inspection may be attached for all trades for final rough-in. | Re-inspection required | 4-7-23: 1-Gas line is not per approved plans; and has changed from tank to tankless. 2-No test on gas, nor DWV piping. 3-Install vertical fire blocking at 10' max spacing at all furr-out walls. Per R302.11#1.2. 4-Complete fireblocking per R302.11.1. 5-Seal all fireblocking. | |
04/12/2023 | COT - RSBU - Residential Intermediate may include Framing, Electrical, Plumbing, and/or Mechanical work. Only one inspection may be attached for all trades for final rough-in. | Partial Pass | Partial per intermediates 4-7-23: 1-Gas line is not per approved plans; and has changed from tank to tankless. 2-No test on gas, nor DWV piping. 3-Install vertical fire blocking at 10' max spacing at all furr-out walls. Per R302.11#1.2. 4-Complete fireblocking per R302.11.1. 5-Seal all fireblocking. 4/12/23: provide new revision to plans for gas line to tankless water heater and change pipe to 3/4" ID. OK to proceed at risk. |
|
07/18/2023 | COT - RSBU - Residential Intermediate may include Framing, Electrical, Plumbing, and/or Mechanical work. Only one inspection may be attached for all trades for final rough-in. | Passed |