Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you can not find what you are looking for please submit a records request.

Permit: T22CM02300

Parcel: 13213066A

Inspection Status: Not Ready

Inspection History: ENGR Engineering Final

Permit Number - T22CM02300

Inspection Description - ENGR Engineering Final

Inspection Status - Not Ready

Date Description Inspector Results Comments
10/27/2022 ENGR Engineering Final Not Ready
08/25/2023 ENGR Engineering Final Partial Pass Side around the buildings, all appear to be OK for a pedestrian access for the general public. Minor cleanup of all sites will be required prior to the authorization for tenants to be moved in. The parking structures for these units will also have to be free and clear of all trash, debris, construction equipment, and contractors personnel equipment once tenancy has been given.
08/30/2023 ENGR Engineering Final Partial Pass Splash pads for roof drain and back ordered plants need to be completed prior to next inspection Okay for TCO level 4
10/04/2023 ENGR Engineering Final Partial Pass OK FOUR LEVEL FOUR 2-49 the entrance of the project need to be redone the handicap parking need to be redone the catch basin need to be look at by surveyors it looks like bust.the roof drain need to be lowered,the trash roll-off need to be removed.
11/27/2023 ENGR Engineering Final Passed