Inspection History Details
Inspection Status: Not Ready
Inspection History: COT - LCBU - Building Final
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 10/27/2022 | COT - LCBU - Building Final | Not Ready | ||
| 04/21/2023 | COT - LCBU - Building Final | Re-inspection required | ||
| 05/12/2023 | COT - LCBU - Building Final | Partial Pass | air gap, under washing room sink, no zip ties please. brace between softener copper drains at floor sink, paint PVC on roof, clamps at all whips, secure weather head, sunshield on hood exhaust flex joint, clamp on gas line on roof missing, close holes on RTUs. recommend level 4 TCO |
|
| 05/24/2023 | COT - LCBU - Building Final | Passed | recommended for c/o |