Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you can not find what you are looking for please submit a records request.
Inspection History Details
Inspection Status: Not Ready
Inspection History: ENGR Engineering Final
Permit Number - T22CM02059
Inspection Description - ENGR Engineering Final
Inspection Status - Not Ready
Date | Description | Inspector | Results | Comments |
---|---|---|---|---|
10/27/2022 | ENGR Engineering Final | Not Ready | ||
08/25/2023 | ENGR Engineering Final | Partial Pass | Side around the buildings, all appear to be OK for a pedestrian access for the general public. Minor cleanup of all sites will be required prior to the authorization for tenants to be moved in. The parking structures for these units will also have to be free and clear of all trash, debris, construction equipment, and contractors personnel equipment once tenancy has been given. | |
08/30/2023 | ENGR Engineering Final | Partial Pass | Roof drain splash pads and back ordered plants need to be completed prior to next inspection okay for TCO level 4 | |
10/04/2023 | ENGR Engineering Final | Partial Pass | OK FOUR LEVEL FOUR 2-49 the entrance of the project need to be redone the handicap parking need to be redone the catch basin need to be look at by surveyors it looks like bust.the roof drain need to be lowered,the trash roll-off need to be removed. | |
11/27/2023 | ENGR Engineering Final | Passed |