Inspection Status: Approved
Inspection History: ENGINEERING - FINAL
| Date |
Description |
Inspector |
Results |
Comments |
| 07/29/2022 |
ENGINEERING - FINAL |
|
Approved |
|
| 07/27/2022 |
ENGINEERING - FINAL |
|
Not ready for Inspection |
Not ready |
| 07/26/2022 |
ENGINEERING - FINAL |
|
Not ready for Inspection |
Not ready. Issue with handrails as noted in last inspection by Dave Roberts. Provide contact information and schedule final inspections |
| 07/25/2022 |
ENGINEERING - FINAL |
|
Partial Approval |
IS PARTIAL, FINAL WILL NOT BE GIVEN TILL THE HANDRAIL ISSUES HAVE BEEN ADDRESSED FOR THE RAMPS AND STAIRS |
| 05/13/2022 |
ENGINEERING - FINAL |
|
Not ready for Inspection |
IS NOT READY AT THIS TIME, NEEDED VERIFICATION ON WHY PERMIT COULD NOT BE ISSUED, STEPHEN BLOOD WITH ENGINEERING REVIEW WAS CONTACTED AND THE PERMIT WAS PASSED. |