Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you cannot find what you are looking for please submit a records request.

Permit: T22CM01398

Parcel: 12504170A


Addresses:

2345 E 2ND ST

Inspection Status: Canceled

Inspection History: COT - RSBU - Residential Intermediate may include Framing, Electrical, Plumbing, HVAC and/or Mechanical work. Only one inspection may be attached for all trades for final rough-in.

Date Description Inspector Results Comments
05/19/2023 COT - RSBU - Residential Intermediate may include Framing, Electrical, Plumbing, HVAC and/or Mechanical work. Only one inspection may be attached for all trades for final rough-in. Canceled Canceled per contractor. 5/19/2023
06/21/2023 COT - RSBU - Residential Intermediate may include Framing, Electrical, Plumbing, HVAC and/or Mechanical work. Only one inspection may be attached for all trades for final rough-in. Re-inspection required 6-21-23: Electrical Panel schedule calls for 12 awg size wires on all 20 amp breakers. Electrician has installed 14 gauge wires for circuits 1, 3, 5, & 7.
06/23/2023 COT - RSBU - Residential Intermediate may include Framing, Electrical, Plumbing, HVAC and/or Mechanical work. Only one inspection may be attached for all trades for final rough-in. Re-inspection required Canceled per contractor. 5/19/2023

6-21-23: Electrical Panel schedule calls for 12 awg size wires on all 20 amp breakers. Electrician has installed 14 gauge wires for circuits 1, 3, 5, & 7.

6/23/23 : plans on site are not approved plans, fire foam not, no water in lines need to reschedule inspection
11/28/2023 COT - RSBU - Residential Intermediate may include Framing, Electrical, Plumbing, HVAC and/or Mechanical work. Only one inspection may be attached for all trades for final rough-in. Not Ready Provide a letter of the in wall work that's been completed without inspections stating full responsibility before receiving sign off. 11/28/2023
12/12/2023 COT - RSBU - Residential Intermediate may include Framing, Electrical, Plumbing, HVAC and/or Mechanical work. Only one inspection may be attached for all trades for final rough-in. Passed