Inspection History Details
Inspection Status: Not Ready
Inspection History: RSBU - Building Final
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 10/27/2022 | RSBU - Building Final | Not Ready | ||
| 09/13/2023 | RSBU - Building Final | Re-inspection required | Exterior receptacles are not functioning. Secure whips at water heater and mini split. Receptacles in east wall are not functioning along with peninsula. Check smoke detectors for communication. Check fuse size for mini split. Out door receptacles need to be WR. 9/13/2023 | |
| 09/18/2023 | RSBU - Building Final | Passed | Exterior receptacles are not functioning. Secure whips at water heater and mini split. Receptacles in east wall are not functioning along with peninsula. Check smoke detectors for communication. Check fuse size for mini split. Out door receptacles need to be WR. 9/13/2023 9/18/23: corrections made |