Inspection Status: Not Ready
Inspection History: RSBU - Building Final
| Date |
Description |
Inspector |
Results |
Comments |
| 10/27/2022 |
RSBU - Building Final |
|
Not Ready |
|
| 05/26/2022 |
RSBU - Building Final |
ARUIZ |
Prior to Final Inspectn |
Entered by ARUIZ1 - CONTRACTOR IS REQUIRED |
| 10/31/2023 |
RSBU - Building Final |
|
Re-inspection required |
10/31/23: missing water hammer arrestor at dishwasher, gfci receptacle missing under sink, panel scheduled missing, prop secure whip at A/C unit, properly secure disconnect stand to roof at A/C unit, A/C condensate drain needs to be coated for up rays and be properly supported. Water heater pressure relief not terminated. gfci at laundry missing. Properly install all vacuum breakers at hose bib. |
| 11/09/2023 |
RSBU - Building Final |
|
Passed |
Approved units #1 and #2, all items were addressed |