Inspection History Details
Inspection Status: Approved
Inspection History: ELECTRIC - FINAL
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 09/23/2022 | ELECTRIC - FINAL | Approved | Approved | |
| 06/09/2022 | ELECTRIC - FINAL | Not ready for Inspection | Not ready | |
| 05/25/2022 | ELECTRIC - FINAL | Cancelled | ca Per Eduardo |
|
| 04/18/2022 | ELECTRIC - FINAL | Not ready for Inspection | Not ready | |
| 02/01/2022 | ELECTRIC - FINAL | Denied | denied Evidence of unlicensed electrical work in main panel, sub panel, and smoke detectors locations, as well as possibly being totally rewired. It appears that this single wide was remodeled without permits/ inspections. Remodel plans must be submitted to the city to obtain a permit and inspections. Note for inspection staff: inspections should be performed on site, not on video. |