Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO.
If you cannot find what you are looking for please
submit a records request.
Inspection Status: Not Ready
Inspection History: RSBU - Building Final
| Date |
Description |
Inspector |
Results |
Comments |
| 10/27/2022 |
RSBU - Building Final |
|
Not Ready |
|
| 02/23/2023 |
RSBU - Building Final |
|
Re-inspection required |
closet door on second floor needs to be installed completely |
| 03/08/2023 |
RSBU - Building Final |
|
Not Ready |
Electrical panel needs to be labeled with legible words. Install cover plates at switches. Exhaust fan in first bathroom is not working. Remove all debris from roof. provide post tension tag at water line. |
| 03/14/2023 |
RSBU - Building Final |
|
Passed |
|