Inspection History Details
Inspection Status: Approved
Inspection History: ELECTRIC - FINAL
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 05/05/2022 | ELECTRIC - FINAL | Approved | AP TEP DGC |
|
| 03/18/2022 | ELECTRIC - FINAL | Correction Required | CO Move arrays on east side of roof to maintain a minimum 3 feet clearance from edge of panels to edge of roof. Cut off metal protruding into this space. |