Inspection Status: Not Ready
Inspection History: ENGR Engineering Final
| Date |
Description |
Inspector |
Results |
Comments |
| 04/14/2023 |
ENGR Engineering Final
|
|
Not Ready |
approval of development package 22–0005 must be obtained prior to engineering final for combination permit. Please schedule all required site inspections. there is No history of any inspections for the site construction. |
| 04/18/2023 |
ENGR Engineering Final
|
|
Not Ready |
complete the installations of water harvesting basins and landscaping areas. Correct the slope at the accessible parking space. schedule inspections from the development package permit as required and provide approved site plans for inspection. |
| 04/20/2023 |
ENGR Engineering Final
|
|
Partial Pass |
OK FOR A LEVEL 4 TCO FOR THIS SITE FOR FULL OCCUPANCY |