Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you can not find what you are looking for please submit a records request.
Inspection History Details
Inspection Status: Not Ready
Inspection History: COT - HCBU - Interior Shear Bracing
Permit Number - T22CM00359
Inspection Description - COT - HCBU - Interior Shear Bracing
Inspection Status - Not Ready
Date | Description | Inspector | Results | Comments |
---|---|---|---|---|
10/26/2022 | COT - HCBU - Interior Shear Bracing | Not Ready | ||
03/20/2023 | COT - HCBU - Interior Shear Bracing | Not Ready | ||
04/18/2023 | COT - HCBU - Interior Shear Bracing | Not Ready | ||
04/24/2023 | COT - HCBU - Interior Shear Bracing | Not Ready | ||
04/26/2023 | COT - HCBU - Interior Shear Bracing | Not Ready | ||
05/22/2023 | COT - HCBU - Interior Shear Bracing | Re-inspection required | 5/22/23: maintain 3/8" min away from edge of gypboard with fasteners. The fastening schedule is 8" on edge and 12" field, do not tear the edge of the board. | |
05/23/2023 | COT - HCBU - Interior Shear Bracing | Partial Pass | 5-23-23: Southwest wing. | |
06/01/2023 | COT - HCBU - Interior Shear Bracing | Partial Pass | ||
06/12/2023 | COT - HCBU - Interior Shear Bracing | Partial Pass | 5/22/23: maintain 3/8" min away from edge of gypboard with fasteners. The fastening schedule is 8" on edge and 12" field, do not tear the edge of the board. 5-23-23: Southwest wing. 6/1/23: art studio, laundry, lounge, theater, east hall and rooms south of hall entire southeast wing okay to apply second layer of 5/8" gyp board 6/12/23: Main entrance lobby and all rooms in the northeast area approved to tape/texture. |
|
12/22/2023 | COT - HCBU - Interior Shear Bracing | Passed |