Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you can not find what you are looking for please submit a records request.
Inspection History Details
Inspection Status: Not Ready
Inspection History: COT - LCBU - Building Final
Permit Number - T22CM00359
Inspection Description - COT - LCBU - Building Final
Inspection Status - Not Ready
Date | Description | Inspector | Results | Comments |
---|---|---|---|---|
10/27/2022 | COT - LCBU - Building Final | Not Ready | ||
COT - LCBU - Building Final | Re-inspection required | 10/16/23: wrap exterior water lines with R-3 insulation and UV resistant tape, all exterior outlets required to be WR, remove ALL construction debris & materials from interior and exterior on site, type all panel schedules, flush floor drain at dining room, install all adjustable hand shower on a vertical bar per 608., Fire Dept and Site Engineering have not signed off. INSPECTION STOPPED. MORE ITEMS MAY BE ADDED AT NEXT INSPECTION. | ||
10/17/2023 | COT - LCBU - Building Final | Not Ready | 10/16/23: wrap exterior water lines with R-3 insulation and UV resistant tape, all exterior outlets required to be WR, remove ALL construction debris & materials from interior and exterior on site, type all panel schedules, flush floor drain at dining room, install all adjustable hand shower on a vertical bar per 608., Fire Dept and Site Engineering have not signed off. INSPECTION STOPPED. MORE ITEMS MAY BE ADDED AT NEXT INSPECTION. 10/17/23: I called Steve Stratigouleas and he stated that Fire & Site Engineering have not inspected yet, and none of the corrections from 10/16/23 have been completed. I informed Steve to not recall for a final building inspection until the above are completed. I also informed Steve that more corrections may be added to the list, as I stopped the inspection mid-way due to excessive corrections. |
|
10/31/2023 | COT - LCBU - Building Final | Re-inspection required | 10/31/23: install a landing outside office door, wrap all exterior water lines with R-3 foam and UV resistant tape, all exterior outlets required to be WR devices, top of wall mounted ladder is not OSHA approved to access the roof, floor drain in Art Room is not flush to concrete floor, install ADA shower seats per 2009 ADA requirements, install shower head slide bar per ADA requirements, waiting on Fire Dept and Site Engineering. | |
11/06/2023 | COT - LCBU - Building Final | Partial Pass | 11/6/23: OK to issue TCO level 4. | |
12/22/2023 | COT - LCBU - Building Final | Passed | 12/21/2023 approved for CofO. |