Inspection History Details
Inspection Status: Approved
Inspection History: PLUMBING - FINAL
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 06/08/2022 | PLUMBING - FINAL | Approved | Ap Close permit |
|
| 02/04/2022 | PLUMBING - FINAL | Denied | de It appears that pvc was used for the TPR drain. Also, it appears that this drain is tied together with a condensate drain. Neither of these issues are acceptable. There is no disconnect at the unit. It needs a disconnect box at the unit or a lockout breaker in the exterior main elec panel. Please correct these 3 items and recall. |