Inspection History Details
Inspection Status: Not Ready
Inspection History: Pool/Spa - Plumbing
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 10/26/2022 | Pool/Spa - Plumbing | Not Ready | ||
| 01/06/2023 | Pool/Spa - Plumbing | Passed | All pre-gunite ok to pour, including bond grid | |
| 12/28/2022 | Pool/Spa - Plumbing | Re-inspection required | water lines not on test |