Inspection Status: Basin - Poor
Inspection History: COT - BASN - Drainage/Basin - Annual Inspection - Recur
| Date |
Description |
Inspector |
Results |
Comments |
| 01/27/2026 |
COT - BASN - Drainage/Basin - Annual Inspection - Recur |
|
Basin - Poor |
Basin is not completely infiltrating water within 12 hours after rain event. |
| 04/03/2024 |
COT - BASN - Drainage/Basin - Annual Inspection - Recur |
|
Basin - Poor |
I cannot write poor enough times to cover this, basin is overwhelmed by homeless camps. |
|
COT - BASN - Drainage/Basin - Annual Inspection - Recur |
|
Scheduled |
|
| 06/29/2023 |
COT - BASN - Drainage/Basin - Annual Inspection - Recur |
|
Basin - Good |
|
| 08/11/2025 |
COT - BASN - Drainage/Basin - Annual Inspection - Recur |
|
Basin - Good |
Some trash in basin that should be cleaned out, otherwise in good functioning condition. |
| 08/20/2024 |
COT - BASN - Drainage/Basin - Annual Inspection - Recur |
|
Basin - Fair |
Minor Sediment, Trash and Debris noted in the southern basins. This material will need to be maintained, cut, and removed from the basins within the next 180 days from this date. A Re-inspection will be performed on this area prior to 2/19/2025 to ensure that the required work has been completed. |