Permit: T21RW05202

Parcel: Unknown


Addresses:

6131 S FONTANA AV


Inspection Status: Passed

Inspection History: TRSP - ROW - Recurring

Permit Number - T21RW05202

Inspection Description - TRSP - ROW - Recurring

Inspection Status - Passed

Date Description Inspector Results Comments
07/26/2022 TRSP - ROW - Recurring Passed TDOT-EXCAV GENERAL INSPECTION - Northstar and vertical one work completed. Asphlt patched landscaping restored. Site passes final ROW inspection.
07/26/2022 TRSP - ROW - Recurring Passed TDOT-Routine Barricade Inspect - Traffic control devices have been removed from site.
02/01/2022 TRSP - ROW - Recurring Re-inspection required TDOT-EXCAV GENERAL INSPECTION - Vertical one and Northstar have completed the site. Landscaping and asphalt have been restored. Meter has been placed. Slurry seal or micro surfacing needs to be completed per utility manual for the south bound lane 25’ on each side of asphalt patch.
02/01/2022 TRSP - ROW - Recurring Re-inspection required TDOT-Routine Barricade Inspect - Traffic control devices have been removed from site.
01/21/2022 TRSP - ROW - Recurring Re-inspection required TDOT-EXCAV GENERAL INSPECTION - Vertical one restored landscaping around swf. Northstar restored asphalt with approved mix and placed pedestal. Meter not yet placed. Awaiting barricade pick up and meter placement to final ROW.
01/21/2022 TRSP - ROW - Recurring Re-inspection required TDOT-Routine Barricade Inspect - Traffic control devices removed from roadway, staged for set up/pickup.
12/21/2021 TRSP - ROW - Recurring Re-inspection required TDOT-EXCAV GENERAL INSPECTION - Northstar completed bore and is done for the day. Potholes have cold patch placed.
12/21/2021 TRSP - ROW - Recurring Re-inspection required TDOT-Routine Barricade Inspect - Traffic control is set according to plan.
12/21/2021 TRSP - ROW - Recurring Re-inspection required TDOT-EXCAV GENERAL INSPECTION - Bore path redlined and approved. Separation of water sewage and gas will be in accordance to utility manual. Bore will be at 84” and come up to 36” on east side. Will vacuum trench to ped location at required depth to cross water service. Redline sent to nick after I and James deih approved redline bore will commence.
12/21/2021 TRSP - ROW - Recurring Re-inspection required TDOT-Routine Barricade Inspect - Traffic control is set according to plan.
12/15/2021 TRSP - ROW - Recurring Re-inspection required TDOT-EXCAV GENERAL INSPECTION - Vertical one and badger vacuum trenching caisson for new swf. Preparing rebar for caisson to drop in and trenching for fiber and electrical vaults.
12/15/2021 TRSP - ROW - Recurring Re-inspection required TDOT-Routine Barricade Inspect - Traffic control is set according to plan.