Inspection History Details
Inspection Status: Passed
Inspection History: TRSP - ROW - Recurring
Permit Number - T21RW05202
Inspection Description - TRSP - ROW - Recurring
Inspection Status - Passed
Date | Description | Inspector | Results | Comments |
---|---|---|---|---|
07/26/2022 | TRSP - ROW - Recurring | Passed | TDOT-EXCAV GENERAL INSPECTION - Northstar and vertical one work completed. Asphlt patched landscaping restored. Site passes final ROW inspection. | |
07/26/2022 | TRSP - ROW - Recurring | Passed | TDOT-Routine Barricade Inspect - Traffic control devices have been removed from site. | |
02/01/2022 | TRSP - ROW - Recurring | Re-inspection required | TDOT-EXCAV GENERAL INSPECTION - Vertical one and Northstar have completed the site. Landscaping and asphalt have been restored. Meter has been placed. Slurry seal or micro surfacing needs to be completed per utility manual for the south bound lane 25’ on each side of asphalt patch. | |
02/01/2022 | TRSP - ROW - Recurring | Re-inspection required | TDOT-Routine Barricade Inspect - Traffic control devices have been removed from site. | |
01/21/2022 | TRSP - ROW - Recurring | Re-inspection required | TDOT-EXCAV GENERAL INSPECTION - Vertical one restored landscaping around swf. Northstar restored asphalt with approved mix and placed pedestal. Meter not yet placed. Awaiting barricade pick up and meter placement to final ROW. | |
01/21/2022 | TRSP - ROW - Recurring | Re-inspection required | TDOT-Routine Barricade Inspect - Traffic control devices removed from roadway, staged for set up/pickup. | |
12/21/2021 | TRSP - ROW - Recurring | Re-inspection required | TDOT-EXCAV GENERAL INSPECTION - Northstar completed bore and is done for the day. Potholes have cold patch placed. | |
12/21/2021 | TRSP - ROW - Recurring | Re-inspection required | TDOT-Routine Barricade Inspect - Traffic control is set according to plan. | |
12/21/2021 | TRSP - ROW - Recurring | Re-inspection required | TDOT-EXCAV GENERAL INSPECTION - Bore path redlined and approved. Separation of water sewage and gas will be in accordance to utility manual. Bore will be at 84” and come up to 36” on east side. Will vacuum trench to ped location at required depth to cross water service. Redline sent to nick after I and James deih approved redline bore will commence. | |
12/21/2021 | TRSP - ROW - Recurring | Re-inspection required | TDOT-Routine Barricade Inspect - Traffic control is set according to plan. | |
12/15/2021 | TRSP - ROW - Recurring | Re-inspection required | TDOT-EXCAV GENERAL INSPECTION - Vertical one and badger vacuum trenching caisson for new swf. Preparing rebar for caisson to drop in and trenching for fiber and electrical vaults. | |
12/15/2021 | TRSP - ROW - Recurring | Re-inspection required | TDOT-Routine Barricade Inspect - Traffic control is set according to plan. |