| 03/03/2022 |
TRSP - ROW - Recurring |
|
Re-inspection required |
TDOT-EXCAV GENERAL INSPECTION - Area not ready for a sidewalk inspection. |
| 04/26/2022 |
TRSP - ROW - Recurring |
|
Re-inspection required |
TDOT-Routine Barricade Inspect - Traffic control is set according to plan. |
| 02/28/2022 |
TRSP - ROW - Recurring |
|
Re-inspection required |
TDOT-EXCAV GENERAL INSPECTION - Area not ready for sidewalk inspection. |
| 04/20/2022 |
TRSP - ROW - Recurring |
|
Re-inspection required |
TDOT-Routine Barricade Inspect - Barricading deficiencies have been fixed. |
| 02/23/2022 |
TRSP - ROW - Recurring |
|
Re-inspection required |
TDOT-EXCAV GENERAL INSPECTION - Area not ready for a sidewalk inspection. |
| 04/15/2022 |
TRSP - ROW - Recurring |
|
Re-inspection required |
TDOT-Routine Barricade Inspect - Talked to Edward from Caylon construction. I told him his permit has expired and it needs to be renewed today. I also informed him that the barricading needs corrections and it needs to be fixed today. |
| 02/17/2022 |
TRSP - ROW - Recurring |
|
Re-inspection required |
TDOT-EXCAV GENERAL INSPECTION - Areas not ready for a sidewalk inspection. I informed them their permit is about ready to expire. I told him to get a new permit. |
| 03/21/2022 |
TRSP - ROW - Recurring |
|
Re-inspection required |
TDOT-Routine Barricade Inspect - Barricading set up per plan. |
| 02/11/2022 |
TRSP - ROW - Recurring |
|
Re-inspection required |
TDOT-EXCAV GENERAL INSPECTION - Areas not ready for sidewalk to be inspected. |
| 03/03/2022 |
TRSP - ROW - Recurring |
|
Re-inspection required |
TDOT-Routine Barricade Inspect - Barricades still set up per plan. |
| 01/24/2022 |
TRSP - ROW - Recurring |
|
Re-inspection required |
TDOT-EXCAV GENERAL INSPECTION - Sidewalk has not been installed yet. |
| 02/23/2022 |
TRSP - ROW - Recurring |
|
Re-inspection required |
TDOT-Routine Barricade Inspect - Barricading set up per plan. |
| 10/20/2022 |
TRSP - ROW - Recurring |
|
Re-inspection required |
TDOT-EXCAV GENERAL INSPECTION - I came by this project for an inspection. Not all the forms are put in place yet but the contractor and I talked about slopes and the domes. |
| 10/17/2022 |
TRSP - ROW - Recurring |
|
Re-inspection required |
TDOT-EXCAV GENERAL INSPECTION - No repairs have been started on the four wheelchair ramps. |
| 10/13/2022 |
TRSP - ROW - Recurring |
|
Re-inspection required |
TDOT-EXCAV GENERAL INSPECTION - On three of the four ramps the truncated domes are roughly 7 feet away from the asphalt. The maximum is 5 feet per standard detail 207. |
| 10/11/2022 |
TRSP - ROW - Recurring |
|
Re-inspection required |
TDOT-EXCAV GENERAL INSPECTION - All four wheelchair ramps were not built to PAG standards. The eastern most ramp the slope is out of spec. |
| 09/19/2022 |
TRSP - ROW - Recurring |
|
Re-inspection required |
TDOT-EXCAV GENERAL INSPECTION - I will keep this permit open because they are still doing work in the right of way. |
| 09/07/2022 |
TRSP - ROW - Recurring |
|
Re-inspection required |
TDOT-EXCAV GENERAL INSPECTION - Landscaping work still going on inside the right of way. |
| 08/29/2022 |
TRSP - ROW - Recurring |
|
Re-inspection required |
TDOT-EXCAV GENERAL INSPECTION - All ramps and sidewalks are within spec. They are still doing some work in the right of way. I am going to keep this open until all the right of way work is complete and the barricading is picked up. |
| 01/14/2022 |
TRSP - ROW - Recurring |
|
Re-inspection required |
TDOT-EXCAV GENERAL INSPECTION - . New sidewalk has not been built yet. |
| 02/11/2022 |
TRSP - ROW - Recurring |
|
Re-inspection required |
TDOT-Routine Barricade Inspect - Barricading still in place. Barricading follows traffic control plan. |
| 08/15/2022 |
TRSP - ROW - Recurring |
|
Re-inspection required |
TDOT-EXCAV GENERAL INSPECTION - I checked the sidewalk area through the driveways and they are all less than 2% cross slope. I previously checked all the sidewalks and ramps and they are all within spec. The barricading has been removed. I’m going to keep it open for a while while the landscapers are still working in the right of way. |
| 08/05/2022 |
TRSP - ROW - Recurring |
|
Re-inspection required |
TDOT-EXCAV GENERAL INSPECTION - All new sidewalk and wheelchair ramps are within spec. The driveways have not been paid yet. So I cannot check the cross slope across the driveway. |
| 07/29/2022 |
TRSP - ROW - Recurring |
|
Re-inspection required |
TDOT-EXCAV GENERAL INSPECTION - Area not ready for inspection. |
| 07/20/2022 |
TRSP - ROW - Recurring |
|
Re-inspection required |
TDOT-EXCAV GENERAL INSPECTION - Area not ready for inspection. |
| 07/13/2022 |
TRSP - ROW - Recurring |
|
Re-inspection required |
TDOT-EXCAV GENERAL INSPECTION - Area not ready for inspection. |
| 07/06/2022 |
TRSP - ROW - Recurring |
|
Re-inspection required |
TDOT-EXCAV GENERAL INSPECTION - Area not ready for inspection. |
| 06/20/2022 |
TRSP - ROW - Recurring |
|
Re-inspection required |
TDOT-EXCAV GENERAL INSPECTION - Area is not ready for a sidewalk inspection. |
| 05/18/2022 |
TRSP - ROW - Recurring |
|
Re-inspection required |
TDOT-EXCAV GENERAL INSPECTION - Sidewalk not ready for inspection. |
| 05/11/2022 |
TRSP - ROW - Recurring |
|
Re-inspection required |
TDOT-EXCAV GENERAL INSPECTION - Area not ready for an inspection. |
| 05/05/2022 |
TRSP - ROW - Recurring |
|
Re-inspection required |
TDOT-EXCAV GENERAL INSPECTION - Sidewalk not ready for inspection. |
| 01/24/2022 |
TRSP - ROW - Recurring |
|
Re-inspection required |
TDOT-Routine Barricade Inspect - Some of the barricading has been knocked down. I talked to the foreman on this project and he’s gonna get it fixed today. I also told him that his permit has expired and then he needs to get it renewed. |
| 12/06/2021 |
TRSP - ROW - Recurring |
|
Re-inspection required |
TDOT-EXCAV GENERAL INSPECTION - Continued. Sidewalk not ready for inspection. |
| 05/02/2022 |
TRSP - ROW - Recurring |
|
Re-inspection required |
TDOT-EXCAV GENERAL INSPECTION - Work on going. Area not ready for sidewalk inspection. |
| 04/26/2022 |
TRSP - ROW - Recurring |
|
Re-inspection required |
TDOT-EXCAV GENERAL INSPECTION - Work on going. |
| 08/05/2022 |
TRSP - ROW - Recurring |
|
Re-inspection required |
TDOT-Routine Barricade Inspect - Traffic control is set according to plan. |
| 04/20/2022 |
TRSP - ROW - Recurring |
|
Re-inspection required |
TDOT-EXCAV GENERAL INSPECTION - Area not ready for sidewalk inspection. |
| 07/29/2022 |
TRSP - ROW - Recurring |
|
Re-inspection required |
TDOT-Routine Barricade Inspect - Traffic control is set according to plan. |
| 04/08/2022 |
TRSP - ROW - Recurring |
|
Re-inspection required |
TDOT-EXCAV GENERAL INSPECTION - Area not ready for inspection. |
| 07/20/2022 |
TRSP - ROW - Recurring |
|
Re-inspection required |
TDOT-Routine Barricade Inspect - Traffic control is set according to plan. |
| 04/05/2022 |
TRSP - ROW - Recurring |
|
Re-inspection required |
TDOT-EXCAV GENERAL INSPECTION - Area not ready for a sidewalk inspection. |
| 07/13/2022 |
TRSP - ROW - Recurring |
|
Re-inspection required |
TDOT-Routine Barricade Inspect - Traffic control is set according to plan. |
| 03/31/2022 |
TRSP - ROW - Recurring |
|
Re-inspection required |
TDOT-EXCAV GENERAL INSPECTION - Area not ready for a sidewalk inspection. |
| 06/20/2022 |
TRSP - ROW - Recurring |
|
Re-inspection required |
TDOT-Routine Barricade Inspect - Traffic control is set according to plan. |
| 03/24/2022 |
TRSP - ROW - Recurring |
|
Re-inspection required |
TDOT-EXCAV GENERAL INSPECTION - Area not ready for sidewalk inspection. |
| 05/18/2022 |
TRSP - ROW - Recurring |
|
Re-inspection required |
TDOT-Routine Barricade Inspect - I talk to the applicant of this permit. Their temporary fencing was blocking a lane of traffic. And I told him that needs to be corrected and he said he would do it. He wanted to take the whole fence out permanently and I would not let him. I told him he needs to fix his temporary fencing so it’s not blocking so much of the road. |
| 03/21/2022 |
TRSP - ROW - Recurring |
|
Re-inspection required |
TDOT-EXCAV GENERAL INSPECTION - Area not ready for a sidewalk inspection. |
| 05/11/2022 |
TRSP - ROW - Recurring |
|
Re-inspection required |
TDOT-Routine Barricade Inspect - Traffic control is set according to plan. |
| 03/14/2022 |
TRSP - ROW - Recurring |
|
Re-inspection required |
TDOT-EXCAV GENERAL INSPECTION - Area not ready for inspection. |
| 05/05/2022 |
TRSP - ROW - Recurring |
|
Re-inspection required |
TDOT-Routine Barricade Inspect - Traffic control is set according to plan. |
| 03/08/2022 |
TRSP - ROW - Recurring |
|
Re-inspection required |
TDOT-EXCAV GENERAL INSPECTION - Area not ready for sidewalk inspection. |
| 05/02/2022 |
TRSP - ROW - Recurring |
|
Re-inspection required |
TDOT-Routine Barricade Inspect - Traffic control is set according to plan. |
| 10/31/2022 |
TRSP - ROW - Recurring |
|
Passed |
|
| 11/30/2021 |
TRSP - ROW - Recurring |
|
Re-inspection required |
TDOT-EXCAV GENERAL INSPECTION - Continued. Sidewalk is not being installed yet. |
| 12/30/2021 |
TRSP - ROW - Recurring |
|
Re-inspection required |
TDOT-Routine Barricade Inspect - Barricades have closed sidewalk. The barricades follow the barricade plan. |