Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you can not find what you are looking for please submit a records request.
Inspection History Details
Inspection Status: Re-inspection required
Inspection History: TRSP - ROW - Recurring
Permit Number - T21RW04859
Inspection Description - TRSP - ROW - Recurring
Inspection Status - Re-inspection required
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 10/06/2022 | TRSP - ROW - Recurring | Re-inspection required | TDOT-EXCAV GENERAL INSPECTION - Electrical conduit has been installed. Roadway repairs still necessary | |
| 09/13/2022 | TRSP - ROW - Recurring | Re-inspection required | TDOT-EXCAV GENERAL INSPECTION - All underground work has been completed. Sundt construction took over project, and understands they will need to repair Roadway. | |
| 08/19/2022 | TRSP - ROW - Recurring | Re-inspection required | TDOT-EXCAV GENERAL INSPECTION - Underground electrical work has been completed. Asphalt repair still needed | |
| 05/26/2022 | TRSP - ROW - Recurring | Re-inspection required | TDOT-EXCAV GENERAL INSPECTION - All underground electric work completed. Roadway repairs still needed | |
| 02/04/2022 | TRSP - ROW - Recurring | Re-inspection required | TDOT-EXCAV GENERAL INSPECTION - All electric underground completed. Temporary asphalt patch still in roadway | |
| 12/07/2022 | TRSP - ROW - Recurring | Complete (Recurring) | ||
| 12/23/2021 | TRSP - ROW - Recurring | Re-inspection required | TDOT-EXCAV GENERAL INSPECTION - All electric work contained inside of PIA property boundaries |