| 01/12/2022 |
TRSP - ROW - Recurring |
|
Re-inspection required |
TDOT-EXCAV GENERAL INSPECTION - This is a continuation of the last inspection on this permit. I just wanted to take more pictures. |
| 05/02/2022 |
TRSP - ROW - Recurring |
|
Re-inspection required |
TDOT-Routine Barricade Inspect - Traffic control is set according to plan. |
| 01/12/2022 |
TRSP - ROW - Recurring |
|
Re-inspection required |
TDOT-EXCAV GENERAL INSPECTION - Work on going. Contractor still doing potholing. |
| 04/26/2022 |
TRSP - ROW - Recurring |
|
Re-inspection required |
TDOT-Routine Barricade Inspect - Traffic control is set according to plan. |
| 04/20/2022 |
TRSP - ROW - Recurring |
|
Re-inspection required |
TDOT-Routine Barricade Inspect - Traffic control is set according to plan. |
| 12/21/2021 |
TRSP - ROW - Recurring |
|
Re-inspection required |
TDOT-EXCAV GENERAL INSPECTION - Continued. Pot holing still going on. Talk to contractor about requirements for micro sealing . I explained that he needs to microseal 25 feet from the first pothole to 25 feet past the last pothole and anywhere any trenching occurs. |
| 04/15/2022 |
TRSP - ROW - Recurring |
|
Re-inspection required |
TDOT-Routine Barricade Inspect - I found no deficiencies in the barricades. |
| 12/08/2021 |
TRSP - ROW - Recurring |
|
Re-inspection required |
TDOT-EXCAV GENERAL INSPECTION - Continued. Potholing has begun. |
| 04/11/2022 |
TRSP - ROW - Recurring |
|
Re-inspection required |
TDOT-Routine Barricade Inspect - Traffic control is set according to plan. |
| 12/01/2021 |
TRSP - ROW - Recurring |
|
Re-inspection required |
TDOT-EXCAV GENERAL INSPECTION - Continued. The only construction I can see going on is blue staking. |
| 10/18/2022 |
TRSP - ROW - Recurring |
|
Re-inspection required |
TDOT-EXCAV GENERAL INSPECTION - Permanent patches and Microsealing have started. There are still a few temporary patches. |
| 10/03/2022 |
TRSP - ROW - Recurring |
|
Re-inspection required |
TDOT-EXCAV GENERAL INSPECTION - Permanent patches are being put in place. |
| 04/05/2022 |
TRSP - ROW - Recurring |
|
Re-inspection required |
TDOT-Routine Barricade Inspect - Traffic control is set according to plan. |
| 11/23/2021 |
TRSP - ROW - Recurring |
|
Re-inspection required |
TDOT-EXCAV GENERAL INSPECTION - Continued Called Jaime Quintero (520)275-8570 and told him recycled asphalt can’t be used in the final lift for patches. |
| 09/20/2022 |
TRSP - ROW - Recurring |
|
Re-inspection required |
TDOT-EXCAV GENERAL INSPECTION - Permanent patches are starting to be put in place. |
| 09/08/2022 |
TRSP - ROW - Recurring |
|
Re-inspection required |
TDOT-EXCAV GENERAL INSPECTION - No sign of permanent restoration of the roadway. |
| 08/30/2022 |
TRSP - ROW - Recurring |
|
Re-inspection required |
TDOT-EXCAV GENERAL INSPECTION - Temporary patches all over the roads. Permanent restoration of roads and alleyways needed. |
| 08/17/2022 |
TRSP - ROW - Recurring |
|
Re-inspection required |
TDOT-EXCAV GENERAL INSPECTION - I had a meeting with Southwest gas, the city streets affected by the work of Southwest Gas will be rehabilitated per the manual. All cuts in the alleyway that cross the entire alleyway will get a final patch and Microsealing. Any other patches by themselves will be a final patch only. All patches within 8 feet of another patch will be one patch. |
| 08/08/2022 |
TRSP - ROW - Recurring |
|
Re-inspection required |
TDOT-EXCAV GENERAL INSPECTION - Permanent patch completed in El Dorado neighborhood. In the main townhomes area permanent patches still needed. |
| 08/01/2022 |
TRSP - ROW - Recurring |
|
Re-inspection required |
TDOT-EXCAV GENERAL INSPECTION - Barricading has been removed. The only thing left is the restoration of the roadways. |
| 07/21/2022 |
TRSP - ROW - Recurring |
|
Re-inspection required |
TDOT-EXCAV GENERAL INSPECTION - This job is pretty much over. All the barricading has been removed. The only thing left is the rehabilitation of the roadway. |
| 07/14/2022 |
TRSP - ROW - Recurring |
|
Re-inspection required |
TDOT-EXCAV GENERAL INSPECTION - This job is pretty much done. All the barricading has been removed. There are quite a bit of temporary patches in the roadway. We are now just waiting on the restoration of the roadway. |
| 07/07/2022 |
TRSP - ROW - Recurring |
|
Re-inspection required |
TDOT-EXCAV GENERAL INSPECTION - Work on going. |
| 06/21/2022 |
TRSP - ROW - Recurring |
|
Re-inspection required |
TDOT-EXCAV GENERAL INSPECTION - Temporary patch in private roadway. The bank protection needs to be rehabilitated. |
| 03/31/2022 |
TRSP - ROW - Recurring |
|
Re-inspection required |
TDOT-Routine Barricade Inspect - Traffic control is set according to plan. |
| 11/09/2021 |
TRSP - ROW - Recurring |
|
Re-inspection required |
TDOT-EXCAV GENERAL INSPECTION - Continued. No crews on site survey is marking property line and right away work will begin any day. |
| 05/18/2022 |
TRSP - ROW - Recurring |
|
Re-inspection required |
TDOT-EXCAV GENERAL INSPECTION - Work on going. |
| 05/10/2022 |
TRSP - ROW - Recurring |
|
Re-inspection required |
TDOT-EXCAV GENERAL INSPECTION - I talked to Arizona pipeline about them crossing the wash at the south end of the Meadows town houses. The concrete is in really bad shape. I told them whatever they cut out they need to fix in kind. The panels are about 20 feet in length I don’t feel they should have to go from panel to panel and they’re making a 4 foot cut. I did tell them if there is a large crack near where they are cutting to cut it beyond the failure in the concrete. They do have to cross into a private drive of El Dorado town houses. They said they are going to meet up with them when they get closer to actually getting into the private street. I am going to stop by and leave my card in case there’s any problems. |
| 05/06/2022 |
TRSP - ROW - Recurring |
|
Re-inspection required |
TDOT-EXCAV GENERAL INSPECTION - Work on going. |
| 05/02/2022 |
TRSP - ROW - Recurring |
|
Re-inspection required |
TDOT-EXCAV GENERAL INSPECTION - Work on going. |
| 04/26/2022 |
TRSP - ROW - Recurring |
|
Re-inspection required |
TDOT-EXCAV GENERAL INSPECTION - Work on going. |
| 04/20/2022 |
TRSP - ROW - Recurring |
|
Re-inspection required |
TDOT-EXCAV GENERAL INSPECTION - Work on going. |
| 04/15/2022 |
TRSP - ROW - Recurring |
|
Re-inspection required |
TDOT-EXCAV GENERAL INSPECTION - Work on going. |
| 04/11/2022 |
TRSP - ROW - Recurring |
|
Re-inspection required |
TDOT-EXCAV GENERAL INSPECTION - Work on going. |
| 04/05/2022 |
TRSP - ROW - Recurring |
|
Re-inspection required |
TDOT-EXCAV GENERAL INSPECTION - Work on going. |
| 03/31/2022 |
TRSP - ROW - Recurring |
|
Re-inspection required |
TDOT-EXCAV GENERAL INSPECTION - Work on going. |
| 03/24/2022 |
TRSP - ROW - Recurring |
|
Re-inspection required |
TDOT-Routine Barricade Inspect - Barricading is set up per plan. |
| 11/02/2021 |
TRSP - ROW - Recurring |
|
Re-inspection required |
TDOT-EXCAV GENERAL INSPECTION - Had pre-con with Southwest gas. |
| 03/24/2022 |
TRSP - ROW - Recurring |
|
Re-inspection required |
TDOT-EXCAV GENERAL INSPECTION - Work on going. |
| 03/21/2022 |
TRSP - ROW - Recurring |
|
Re-inspection required |
TDOT-EXCAV GENERAL INSPECTION - Work on going. |
| 03/14/2022 |
TRSP - ROW - Recurring |
|
Re-inspection required |
TDOT-EXCAV GENERAL INSPECTION - Work on going. |
| 03/08/2022 |
TRSP - ROW - Recurring |
|
Re-inspection required |
TDOT-EXCAV GENERAL INSPECTION - Work on going. |
| 03/03/2022 |
TRSP - ROW - Recurring |
|
Re-inspection required |
TDOT-EXCAV GENERAL INSPECTION - Work on going. |
| 02/28/2022 |
TRSP - ROW - Recurring |
|
Re-inspection required |
TDOT-EXCAV GENERAL INSPECTION - Work on going. |
| 02/23/2022 |
TRSP - ROW - Recurring |
|
Re-inspection required |
TDOT-EXCAV GENERAL INSPECTION - Work on going. |
| 02/18/2022 |
TRSP - ROW - Recurring |
|
Re-inspection required |
TDOT-EXCAV GENERAL INSPECTION - Work on going. |
| 02/15/2022 |
TRSP - ROW - Recurring |
|
Re-inspection required |
TDOT-EXCAV GENERAL INSPECTION - Work on going. |
| 07/07/2022 |
TRSP - ROW - Recurring |
|
Re-inspection required |
TDOT-Routine Barricade Inspect - Traffic control is set according to plan. |
| 01/28/2022 |
TRSP - ROW - Recurring |
|
Re-inspection required |
TDOT-EXCAV GENERAL INSPECTION - Work on going. |
| 05/06/2022 |
TRSP - ROW - Recurring |
|
Re-inspection required |
TDOT-Routine Barricade Inspect - Traffic control is set according to plan. |
| 03/21/2022 |
TRSP - ROW - Recurring |
|
Re-inspection required |
TDOT-Routine Barricade Inspect - Barricade set per plan. |
| 10/27/2021 |
TRSP - ROW - Recurring |
|
Re-inspection required |
TDOT-EXCAV GENERAL INSPECTION - Continued. No signs of work and no activity at this time |
| 11/15/2022 |
TRSP - ROW - Recurring |
|
Complete (Recurring) |
|