Permit: T21RW04606

Parcel: 133422380


Addresses:

6766 E CALLE LA PAZ

Inspection Status: Re-inspection required

Inspection History: TRSP - ROW - Recurring

Date Description Inspector Results Comments
01/12/2022 TRSP - ROW - Recurring Re-inspection required TDOT-EXCAV GENERAL INSPECTION - This is a continuation of the last inspection on this permit. I just wanted to take more pictures.
05/02/2022 TRSP - ROW - Recurring Re-inspection required TDOT-Routine Barricade Inspect - Traffic control is set according to plan.
01/12/2022 TRSP - ROW - Recurring Re-inspection required TDOT-EXCAV GENERAL INSPECTION - Work on going. Contractor still doing potholing.
04/26/2022 TRSP - ROW - Recurring Re-inspection required TDOT-Routine Barricade Inspect - Traffic control is set according to plan.
04/20/2022 TRSP - ROW - Recurring Re-inspection required TDOT-Routine Barricade Inspect - Traffic control is set according to plan.
12/21/2021 TRSP - ROW - Recurring Re-inspection required TDOT-EXCAV GENERAL INSPECTION - Continued. Pot holing still going on. Talk to contractor about requirements for micro sealing . I explained that he needs to microseal 25 feet from the first pothole to 25 feet past the last pothole and anywhere any trenching occurs.
04/15/2022 TRSP - ROW - Recurring Re-inspection required TDOT-Routine Barricade Inspect - I found no deficiencies in the barricades.
12/08/2021 TRSP - ROW - Recurring Re-inspection required TDOT-EXCAV GENERAL INSPECTION - Continued. Potholing has begun.
04/11/2022 TRSP - ROW - Recurring Re-inspection required TDOT-Routine Barricade Inspect - Traffic control is set according to plan.
12/01/2021 TRSP - ROW - Recurring Re-inspection required TDOT-EXCAV GENERAL INSPECTION - Continued. The only construction I can see going on is blue staking.
10/18/2022 TRSP - ROW - Recurring Re-inspection required TDOT-EXCAV GENERAL INSPECTION - Permanent patches and Microsealing have started. There are still a few temporary patches.
10/03/2022 TRSP - ROW - Recurring Re-inspection required TDOT-EXCAV GENERAL INSPECTION - Permanent patches are being put in place.
04/05/2022 TRSP - ROW - Recurring Re-inspection required TDOT-Routine Barricade Inspect - Traffic control is set according to plan.
11/23/2021 TRSP - ROW - Recurring Re-inspection required TDOT-EXCAV GENERAL INSPECTION - Continued Called Jaime Quintero (520)275-8570 and told him recycled asphalt can’t be used in the final lift for patches.
09/20/2022 TRSP - ROW - Recurring Re-inspection required TDOT-EXCAV GENERAL INSPECTION - Permanent patches are starting to be put in place.
09/08/2022 TRSP - ROW - Recurring Re-inspection required TDOT-EXCAV GENERAL INSPECTION - No sign of permanent restoration of the roadway.
08/30/2022 TRSP - ROW - Recurring Re-inspection required TDOT-EXCAV GENERAL INSPECTION - Temporary patches all over the roads. Permanent restoration of roads and alleyways needed.
08/17/2022 TRSP - ROW - Recurring Re-inspection required TDOT-EXCAV GENERAL INSPECTION - I had a meeting with Southwest gas, the city streets affected by the work of Southwest Gas will be rehabilitated per the manual. All cuts in the alleyway that cross the entire alleyway will get a final patch and Microsealing. Any other patches by themselves will be a final patch only. All patches within 8 feet of another patch will be one patch.
08/08/2022 TRSP - ROW - Recurring Re-inspection required TDOT-EXCAV GENERAL INSPECTION - Permanent patch completed in El Dorado neighborhood. In the main townhomes area permanent patches still needed.
08/01/2022 TRSP - ROW - Recurring Re-inspection required TDOT-EXCAV GENERAL INSPECTION - Barricading has been removed. The only thing left is the restoration of the roadways.
07/21/2022 TRSP - ROW - Recurring Re-inspection required TDOT-EXCAV GENERAL INSPECTION - This job is pretty much over. All the barricading has been removed. The only thing left is the rehabilitation of the roadway.
07/14/2022 TRSP - ROW - Recurring Re-inspection required TDOT-EXCAV GENERAL INSPECTION - This job is pretty much done. All the barricading has been removed. There are quite a bit of temporary patches in the roadway. We are now just waiting on the restoration of the roadway.
07/07/2022 TRSP - ROW - Recurring Re-inspection required TDOT-EXCAV GENERAL INSPECTION - Work on going.
06/21/2022 TRSP - ROW - Recurring Re-inspection required TDOT-EXCAV GENERAL INSPECTION - Temporary patch in private roadway. The bank protection needs to be rehabilitated.
03/31/2022 TRSP - ROW - Recurring Re-inspection required TDOT-Routine Barricade Inspect - Traffic control is set according to plan.
11/09/2021 TRSP - ROW - Recurring Re-inspection required TDOT-EXCAV GENERAL INSPECTION - Continued. No crews on site survey is marking property line and right away work will begin any day.
05/18/2022 TRSP - ROW - Recurring Re-inspection required TDOT-EXCAV GENERAL INSPECTION - Work on going.
05/10/2022 TRSP - ROW - Recurring Re-inspection required TDOT-EXCAV GENERAL INSPECTION - I talked to Arizona pipeline about them crossing the wash at the south end of the Meadows town houses. The concrete is in really bad shape. I told them whatever they cut out they need to fix in kind. The panels are about 20 feet in length I don’t feel they should have to go from panel to panel and they’re making a 4 foot cut. I did tell them if there is a large crack near where they are cutting to cut it beyond the failure in the concrete. They do have to cross into a private drive of El Dorado town houses. They said they are going to meet up with them when they get closer to actually getting into the private street. I am going to stop by and leave my card in case there’s any problems.
05/06/2022 TRSP - ROW - Recurring Re-inspection required TDOT-EXCAV GENERAL INSPECTION - Work on going.
05/02/2022 TRSP - ROW - Recurring Re-inspection required TDOT-EXCAV GENERAL INSPECTION - Work on going.
04/26/2022 TRSP - ROW - Recurring Re-inspection required TDOT-EXCAV GENERAL INSPECTION - Work on going.
04/20/2022 TRSP - ROW - Recurring Re-inspection required TDOT-EXCAV GENERAL INSPECTION - Work on going.
04/15/2022 TRSP - ROW - Recurring Re-inspection required TDOT-EXCAV GENERAL INSPECTION - Work on going.
04/11/2022 TRSP - ROW - Recurring Re-inspection required TDOT-EXCAV GENERAL INSPECTION - Work on going.
04/05/2022 TRSP - ROW - Recurring Re-inspection required TDOT-EXCAV GENERAL INSPECTION - Work on going.
03/31/2022 TRSP - ROW - Recurring Re-inspection required TDOT-EXCAV GENERAL INSPECTION - Work on going.
03/24/2022 TRSP - ROW - Recurring Re-inspection required TDOT-Routine Barricade Inspect - Barricading is set up per plan.
11/02/2021 TRSP - ROW - Recurring Re-inspection required TDOT-EXCAV GENERAL INSPECTION - Had pre-con with Southwest gas.
03/24/2022 TRSP - ROW - Recurring Re-inspection required TDOT-EXCAV GENERAL INSPECTION - Work on going.
03/21/2022 TRSP - ROW - Recurring Re-inspection required TDOT-EXCAV GENERAL INSPECTION - Work on going.
03/14/2022 TRSP - ROW - Recurring Re-inspection required TDOT-EXCAV GENERAL INSPECTION - Work on going.
03/08/2022 TRSP - ROW - Recurring Re-inspection required TDOT-EXCAV GENERAL INSPECTION - Work on going.
03/03/2022 TRSP - ROW - Recurring Re-inspection required TDOT-EXCAV GENERAL INSPECTION - Work on going.
02/28/2022 TRSP - ROW - Recurring Re-inspection required TDOT-EXCAV GENERAL INSPECTION - Work on going.
02/23/2022 TRSP - ROW - Recurring Re-inspection required TDOT-EXCAV GENERAL INSPECTION - Work on going.
02/18/2022 TRSP - ROW - Recurring Re-inspection required TDOT-EXCAV GENERAL INSPECTION - Work on going.
02/15/2022 TRSP - ROW - Recurring Re-inspection required TDOT-EXCAV GENERAL INSPECTION - Work on going.
07/07/2022 TRSP - ROW - Recurring Re-inspection required TDOT-Routine Barricade Inspect - Traffic control is set according to plan.
01/28/2022 TRSP - ROW - Recurring Re-inspection required TDOT-EXCAV GENERAL INSPECTION - Work on going.
05/06/2022 TRSP - ROW - Recurring Re-inspection required TDOT-Routine Barricade Inspect - Traffic control is set according to plan.
03/21/2022 TRSP - ROW - Recurring Re-inspection required TDOT-Routine Barricade Inspect - Barricade set per plan.
10/27/2021 TRSP - ROW - Recurring Re-inspection required TDOT-EXCAV GENERAL INSPECTION - Continued. No signs of work and no activity at this time
11/15/2022 TRSP - ROW - Recurring Complete (Recurring)