Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO.
If you cannot find what you are looking for please
submit a records request.
Inspection Status: Re-inspection required
Inspection History: TRSP - ROW - Recurring
| Date |
Description |
Inspector |
Results |
Comments |
| 06/28/2022 |
TRSP - ROW - Recurring |
|
Re-inspection required |
TDOT-EXCAV GENERAL INSPECTION - All underground water work has been completed. Asphalt patches have been installed. Roadway surface treatment still needed |
| 04/05/2022 |
TRSP - ROW - Recurring |
|
Re-inspection required |
TDOT-EXCAV GENERAL INSPECTION - All underground work has been completed. Waiting on surface treatment to close permit |
| 03/22/2022 |
TRSP - ROW - Recurring |
|
Re-inspection required |
TDOT-EXCAV GENERAL INSPECTION - Talked with Rick from Canyon building and design, waiting on micro surface, slurry seal or seal coat to be completed on Prince |
| 02/18/2022 |
TRSP - ROW - Recurring |
|
Re-inspection required |
TDOT-EXCAV GENERAL INSPECTION - More results |
| 02/18/2022 |
TRSP - ROW - Recurring |
|
Re-inspection required |
TDOT-EXCAV GENERAL INSPECTION - Roadway needs to be micro surface or slurry sealed per directions from Precon. Uploading compaction test results |
| 02/15/2022 |
TRSP - ROW - Recurring |
|
Re-inspection required |
TDOT-EXCAV GENERAL INSPECTION - All underground water installation has been completed. All asphalt patching has also been completed. Micro surface or slurry of roadway still needed |
| 01/31/2022 |
TRSP - ROW - Recurring |
|
Re-inspection required |
TDOT-EXCAV GENERAL INSPECTION - New waterline has been installed. Asphalt repairs have been completed. Roadway still needs a slurry seal or micro surface. |
| 01/19/2022 |
TRSP - ROW - Recurring |
|
Re-inspection required |
TDOT-EXCAV GENERAL INSPECTION - Contractor installing new concrete collars around new valve boxes. |
| 08/29/2022 |
TRSP - ROW - Recurring |
|
Re-inspection required |
TDOT-EXCAV GENERAL INSPECTION - Roadway surface treatment still needed |
| 01/14/2022 |
TRSP - ROW - Recurring |
|
Passed |
TDOT-EXCAV GENERAL INSPECTION - All new waterlines and hydrant has been installed. All asphalt patching has been completed. Micro surface or slurry seal will be completed along with new waterline from country club to project . |
| 12/07/2022 |
TRSP - ROW - Recurring |
|
Passed |
|