Inspection Status: Re-inspection required
Inspection History: TRSP - ROW - Recurring
| Date |
Description |
Inspector |
Results |
Comments |
| 03/21/2022 |
TRSP - ROW - Recurring |
|
Re-inspection required |
TDOT-EXCAV GENERAL INSPECTION - Underground gas work has been completed. Asphalt patch has been installed. Small section of wedge curb still needs to be repaired |
| 02/10/2022 |
TRSP - ROW - Recurring |
|
Re-inspection required |
TDOT-EXCAV GENERAL INSPECTION - Curb repairs still needed |
| 01/11/2022 |
TRSP - ROW - Recurring |
|
Re-inspection required |
TDOT-EXCAV GENERAL INSPECTION - Underground gas work completed. Permanent asphalt patch in place. Existing roadway is in rough condition. One section of sidewalk still needs replacing. |
| 12/03/2021 |
TRSP - ROW - Recurring |
|
Re-inspection required |
TDOT-EXCAV GENERAL INSPECTION - Underground gas work has been completed. Temporary asphalt patch still in place. Area has been Saw cut |
| 11/08/2021 |
TRSP - ROW - Recurring |
|
Re-inspection required |
TDOT-EXCAV GENERAL INSPECTION - Temporary asphalt patch still in place |
| 01/13/2023 |
TRSP - ROW - Recurring |
|
Complete (Recurring) |
All work is complete. Wedge curb on corner still needs to be repaired. |
| 10/27/2021 |
TRSP - ROW - Recurring |
|
Re-inspection required |
TDOT-EXCAV GENERAL INSPECTION - Underground work complete. Temporary patch in place. |