01/18/2022 TRSP - ROW - Recurring Re-inspection required TDOT-EXCAV GENERAL INSPECTION - R drilling placed 6” concrete cap on conduit above 28”. Tomorrow will compact and process AB material on top.
01/18/2022 TRSP - ROW - Recurring Re-inspection required TDOT-Routine Barricade Inspect - Traffic control is set according to plan.
01/18/2022 TRSP - ROW - Recurring Re-inspection required TDOT-EXCAV GENERAL INSPECTION - R drilling placed plates on roadway for slurry to cure overnight.
01/18/2022 TRSP - ROW - Recurring Re-inspection required TDOT-Routine Barricade Inspect - Traffic control devices removed from roadway, staged for set up/pickup.
01/18/2022 TRSP - ROW - Recurring Re-inspection required TDOT-EXCAV GENERAL INSPECTION - R drilling finishing open trenching. Plates placed on pot holes. Broke cap for swf will need to be redone.
01/18/2022 TRSP - ROW - Recurring Re-inspection required TDOT-Routine Barricade Inspect - Continued
01/18/2022 TRSP - ROW - Recurring Re-inspection required TDOT-EXCAV GENERAL INSPECTION - R drilling backfilling with slurry and open trenching from bore pit to swf site.
01/18/2022 TRSP - ROW - Recurring Re-inspection required TDOT-Routine Barricade Inspect - Continued
01/14/2022 TRSP - ROW - Recurring Re-inspection required TDOT-EXCAV GENERAL INSPECTION - R drilling finish trenching and is preparing to backfill trench. Trench at 36” next to electrical conduit encased in concrete. Waiver was approved. Will continue Monday.
01/14/2022 TRSP - ROW - Recurring Re-inspection required TDOT-Routine Barricade Inspect - Traffic control is set according to plan.
01/13/2022 TRSP - ROW - Recurring Re-inspection required TDOT-EXCAV GENERAL INSPECTION - R drilling boring at 36” in west bound lane from swf east to cherry. Waiver will need approval for south bore/trench. Bore route will be 38” under 4” water main with 1’ clearance. 2’ clearance above 6” HP gas line. Run along UA electrical concrete encased conduit to pole.
01/13/2022 TRSP - ROW - Recurring Re-inspection required TDOT-Routine Barricade Inspect - Traffic control is set according to plan.
01/11/2022 TRSP - ROW - Recurring Re-inspection required TDOT-EXCAV GENERAL INSPECTION - Hit conduit around 1” abandoned gas line service. Southwest gas confirmed abandoned gas line. Not marked by blue stake. 12” HP gas is at 66” will bore 36-40” over top backfill 2’ sand and slurry to bottom of asphalt. Continue to pot hole. Southwest barricades bringing bump signs plates to be placed on potholes with cold patch around edges.
01/11/2022 TRSP - ROW - Recurring Re-inspection required TDOT-Routine Barricade Inspect - Traffic control is set according to plan.
01/11/2022 TRSP - ROW - Recurring Re-inspection required TDOT-EXCAV GENERAL INSPECTION - R drilling pot holing. Bore path to move 7’ south at swf to avoid UA electrical conduit. Open trench north to swf and place concrete cap. Trench will be 20”. Bore rout east will be 5’ south of electric and 5’ north of sewer. Bore east to cherry. Pot holing 12” HP gas. Micro surface or slur ray not needed VSSI is coming back at a future time to complete micro surface. Asphalt to be patched.
01/11/2022 TRSP - ROW - Recurring Re-inspection required TDOT-Routine Barricade Inspect - Traffic control is set according to plan.
01/19/2022 TRSP - ROW - Recurring Re-inspection required TDOT-EXCAV GENERAL INSPECTION - R drilling replaced cap around swf. Backfilled trench with AB and placing cold patch. Material visually seemed to be pumping during compaction they will compact again when it dries out some tomorrow or this afternoon.
01/19/2022 TRSP - ROW - Recurring Re-inspection required TDOT-Routine Barricade Inspect - Traffic control is set according to plan.
01/10/2022 TRSP - ROW - Recurring Re-inspection required TDOT-EXCAV GENERAL INSPECTION - R drilling preparing to vacuum pothole utilities. Gas standby needs calling within 4’ of any high pressure gas line. A 12” hp gas line with valves and a 6” hp will be crossed as wel as a 4” and 16” water line.
01/10/2022 TRSP - ROW - Recurring Re-inspection required TDOT-Routine Barricade Inspect - Traffic control is set according to plan.
01/18/2023 TRSP - ROW - Recurring Complete (Recurring)