| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 08/25/2022 | TRSP - ROW - Recurring | Re-inspection required | TDOT-EXCAV GENERAL INSPECTION - Asphalt patches need completion in bike lane south boun along mountain. Permit needs renewal. | |
| 08/02/2022 | TRSP - ROW - Recurring | Re-inspection required | TDOT-EXCAV GENERAL INSPECTION - Patch across mountain only one completed. Three more patches in bike lane need to be done. Called Chris with optimum he will be renewing permit to finish work. | |
| 08/25/2022 | TRSP - ROW - Recurring | Re-inspection required | TDOT-Routine Barricade Inspect - Traffic control devices have been removed from site. | |
| 08/02/2022 | TRSP - ROW - Recurring | Re-inspection required | TDOT-Routine Barricade Inspect - Traffic control devices have been removed from site. | |
| 11/23/2021 | TRSP - ROW - Recurring | Re-inspection required | TDOT-EXCAV GENERAL INSPECTION - Optimum completing north bound asphalt south bound is completed. | |
| 11/23/2021 | TRSP - ROW - Recurring | Re-inspection required | TDOT-EXCAV GENERAL INSPECTION - Optimum preparing to cut and patch asphalt across Mountain at water street. Lowering vault it needed to be flush with landscaping. |
|
| 11/23/2021 | TRSP - ROW - Recurring | Re-inspection required | TDOT-Routine Barricade Inspect - Traffic control is set according to plan. | |
| 11/22/2021 | TRSP - ROW - Recurring | Re-inspection required | TDOT-EXCAV GENERAL INSPECTION - Optimum trenching across mountain to swf site and placing vault. Had roadway closed and were trenching entire width at once. Told them to open a lane and must have lane open at all times. Actions were corrected. | |
| 11/23/2021 | TRSP - ROW - Recurring | Re-inspection required | TDOT-Routine Barricade Inspect - Traffic control is set according to plan. | |
| 11/19/2021 | TRSP - ROW - Recurring | Re-inspection required | TDOT-EXCAV GENERAL INSPECTION - Optimum finishing bore from alley north of water to alley north of silver. Placing vault and riser at pole in alley. Monday open trench across mountain to swf. | |
| 11/22/2021 | TRSP - ROW - Recurring | Re-inspection required | TDOT-Routine Barricade Inspect - Traffic control set. Optimum had mountain Ave completely closed and was detouring traffic through neighborhood. Advised them to open a lane it was not permitted. Actions were immediately corrected. | |
| 11/18/2021 | TRSP - ROW - Recurring | Re-inspection required | TDOT-EXCAV GENERAL INSPECTION - Optimum boring north on southbound bike lane to alley along curb at roughly 96” deep. Yesterday completed bore south to water street west side of Roadway. |
|
| 11/19/2021 | TRSP - ROW - Recurring | Re-inspection required | TDOT-Routine Barricade Inspect - Traffic control is set according to plan. | |
| 11/16/2021 | TRSP - ROW - Recurring | Re-inspection required | TDOT-EXCAV GENERAL INSPECTION - Optimum onsite to pothole south bound bike lane for bore tomorrow. Install riser and vault in alley. To get to swf they will open trench across mountain. | |
| 11/18/2021 | TRSP - ROW - Recurring | Re-inspection required | TDOT-Routine Barricade Inspect - Traffic control is set according to plan. | |
| 08/27/2021 | TRSP - ROW - Recurring | Re-inspection required | TDOT-EXCAV GENERAL INSPECTION - Pre con with optimum want to trench across mountain traffic control will need change with flaggers. And lane closures. | |
| 11/09/2022 | TRSP - ROW - Recurring | Not Ready | No activity | |
| 11/16/2021 | TRSP - ROW - Recurring | Re-inspection required | TDOT-Routine Barricade Inspect - Traffic control being placed. |