Inspection History Details
Inspection Status: Passed
Inspection History: TRSP - ROW - Recurring
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 11/23/2021 | TRSP - ROW - Recurring | Passed | TDOT-EXCAV GENERAL INSPECTION - Vertical one placed pole per plans. Landscaping restored site passes final row inspection | |
| 07/22/2021 | TRSP - ROW - Recurring | Re-inspection required | TDOT-EXCAV GENERAL INSPECTION - Vertical one placed rebar for pole foundation and hand boxes. Waiting for concrete truck and slurry to pour site at 1400 | |
| 11/23/2021 | TRSP - ROW - Recurring | Passed | TDOT-Routine Barricade Inspect - Traffic control devices have been removed from site. | |
| 07/21/2021 | TRSP - ROW - Recurring | Re-inspection required | TDOT-EXCAV GENERAL INSPECTION - Vertical one preparing to remove Pole at site. |
|
| 07/22/2021 | TRSP - ROW - Recurring | Re-inspection required | TDOT-Routine Barricade Inspect - Traffic control is set according to plan. | |
| 06/30/2021 | TRSP - ROW - Recurring | Re-inspection required | TDOT-EXCAV GENERAL INSPECTION - Pre construction meeting with vertical one Verizon south west barricades and Deih. Traffic control plan is suffice. Pole removal must watch over head utilities. | |
| 07/21/2021 | TRSP - ROW - Recurring | Re-inspection required | TDOT-Routine Barricade Inspect - Traffic control devices removed from roadway, staged for set up/pickup. |