Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you can not find what you are looking for please submit a records request.
Inspection History Details
Inspection Status: Re-inspection required
Inspection History: TRSP - ROW - Recurring
Permit Number - T21RW01451
Inspection Description - TRSP - ROW - Recurring
Inspection Status - Re-inspection required
Date | Description | Inspector | Results | Comments |
---|---|---|---|---|
07/07/2021 | TRSP - ROW - Recurring | Re-inspection required | TDOT-EXCAV GENERAL INSPECTION - Sidewalk and landscaping restored. ROW appears to be according to plans and passes final inspection. | |
07/07/2021 | TRSP - ROW - Recurring | Re-inspection required | TDOT-Routine Barricade Inspect - Traffic control devices have been removed from site. | |
06/22/2021 | TRSP - ROW - Recurring | Re-inspection required | TDOT-EXCAV GENERAL INSPECTION - Pole not placed. Sidewalk restored. | |
06/22/2021 | TRSP - ROW - Recurring | Re-inspection required | TDOT-Routine Barricade Inspect - Barricades taken off roadway. Pole foundation covered by type 2 | |
06/11/2021 | TRSP - ROW - Recurring | Re-inspection required | TDOT-EXCAV GENERAL INSPECTION - Verticle one preparing site for concrete pour this afternoon. Installing hand boxes and conduit. | |
06/11/2021 | TRSP - ROW - Recurring | Re-inspection required | TDOT-Routine Barricade Inspect - Traffic control is set according to plan. | |
05/28/2021 | TRSP - ROW - Recurring | Re-inspection required | TDOT-EXCAV GENERAL INSPECTION - Meeting took place on 746 W Kelso St. people attending meeting were Alex and James from DEIH, Nick Dominguez and Nancy Carrillo from Vertical one, Larry Castro from VZN, and Caitlin Ripley from Southwest Barricades. Pole will be installed where existing pole was. Vertical one to keep mast arm for future pole light installment. No meter box will be placed power will be coming from jbox. One or two panels of concrete sidewalk will be removed and replaced. Spoke to Nancy Carrillo from Vertical one and stated would send ROW Precon filled out sheets and pics of notification to neighbors to Dan Robertson, Travis Horness, and my self. |
|
05/28/2021 | TRSP - ROW - Recurring | Re-inspection required | TDOT-Routine Barricade Inspect - Traffic control will be set as planned. Will need closed sidewalk signs and flagmen operation. |