Date | Description | Inspector | Results | Comments |
---|---|---|---|---|
11/01/2021 | TRSP - ROW - Recurring | Passed | TDOT-Routine Barricade Inspect - Traffic control devices have been removed from site. | |
07/07/2021 | TRSP - ROW - Recurring | Re-inspection required | TDOT-Routine Barricade Inspect - Traffic control devices have been removed from site. | |
11/01/2021 | TRSP - ROW - Recurring | Re-inspection required | TDOT-EXCAV GENERAL INSPECTION - Pole placed and signs. Sidewalk and landscaping restored site passes final ROW inspection | |
06/22/2021 | TRSP - ROW - Recurring | Re-inspection required | TDOT-EXCAV GENERAL INSPECTION - Pole not placed. Landscaping needs restoration clean up.! | |
06/22/2021 | TRSP - ROW - Recurring | Re-inspection required | TDOT-Routine Barricade Inspect - Ada wall around pole foundation. Pedestrian walkway open. | |
06/09/2021 | TRSP - ROW - Recurring | Re-inspection required | TDOT-EXCAV GENERAL INSPECTION - Concrete for caisson and slurry pour | |
06/09/2021 | TRSP - ROW - Recurring | Re-inspection required | TDOT-Routine Barricade Inspect - Traffic control is set according to plan. | |
06/09/2021 | TRSP - ROW - Recurring | Re-inspection required | TDOT-EXCAV GENERAL INSPECTION - Verticle one preparing for pour at 1400. Placing conduit. | |
06/09/2021 | TRSP - ROW - Recurring | Re-inspection required | TDOT-Routine Barricade Inspect - Traffic control is set according to plan. Flaggers onsite | |
05/28/2021 | TRSP - ROW - Recurring | Re-inspection required | TDOT-EXCAV GENERAL INSPECTION - Precon took place in address 460 W Glenn St. people attending meeting were Alex and James from DEIH, Nick Dominguez and Nancy Carrillo From Vertical one, Larry Castro from VZN, and Caitlin Ripley from Southwest Barricades. No meter box for this site power will be coming from J box in front of future pole vertical one to keep mastarm for future light istallation of pole. Spoke to Nancy Carrillo from vertical one and stated will be sending ROW pre-con meeting filled out sheets and pictures of notification to neighbors via email to Dan Robertson Travis Horness and myself. |
|
05/28/2021 | TRSP - ROW - Recurring | Re-inspection required | TDOT-Routine Barricade Inspect - Traffic control will be set as planed. If 20’ ft is not cleared will use flagmen to direct traffic. Traffic control to be installed at 9 am and removed by no later than 330pm. |