Date | Description | Inspector | Results | Comments |
---|---|---|---|---|
07/14/2021 | TRSP - ROW - Recurring | Re-inspection required | TDOT-EXCAV GENERAL INSPECTION - Pole placed. Landscaping restored properly. Signs placed on pole. ROW appears to be according to plans | |
06/04/2021 | TRSP - ROW - Recurring | Re-inspection required | TDOT-EXCAV GENERAL INSPECTION - Place and stand pole with antenna and light. Secured pole and level. | |
07/14/2021 | TRSP - ROW - Recurring | Re-inspection required | TDOT-Routine Barricade Inspect - Traffic control devices have been removed from site. | |
05/24/2021 | TRSP - ROW - Recurring | Re-inspection required | TDOT-EXCAV GENERAL INSPECTION - Poured new caisson for pole. Slump was 2” Sam K DEIH directed them to add 3 gallons of water. Slump was a 5.5” at 80°f Sam K approved the pour and allowed pouring to continue. Slurry poured around caisson and hand boxes. | |
06/04/2021 | TRSP - ROW - Recurring | Re-inspection required | TDOT-Routine Barricade Inspect - Traffic control is set according to plan. | |
05/19/2021 | TRSP - ROW - Recurring | Re-inspection required | TDOT-EXCAV GENERAL INSPECTION - Hit roots and branches on yucca plant. Will need to be replaced upon completion. Excavation required tractor due to ground being hard for caisson removal. | |
05/24/2021 | TRSP - ROW - Recurring | Re-inspection required | TDOT-Routine Barricade Inspect - Traffic control is set according to plan. | |
05/18/2021 | TRSP - ROW - Recurring | Re-inspection required | TDOT-EXCAV GENERAL INSPECTION - Ground too hard only got 2’ down will resume tomorrow. | |
05/19/2021 | TRSP - ROW - Recurring | Re-inspection required | TDOT-Routine Barricade Inspect - Traffic control is set according to plan. | |
05/17/2021 | TRSP - ROW - Recurring | Re-inspection required | TDOT-EXCAV GENERAL INSPECTION - Removed old pole. | |
05/18/2021 | TRSP - ROW - Recurring | Re-inspection required | TDOT-Routine Barricade Inspect - Traffic control is set according to plan. | |
05/06/2021 | TRSP - ROW - Recurring | Re-inspection required | TDOT-EXCAV GENERAL INSPECTION - Replace old pole with antenna for Verizon. Discussed moving fiber box out of drainage. Landscaping must be restored and extra precautions for plants near pole. Dan COT present valor Verizon and Deih representing cot electric. | |
05/17/2021 | TRSP - ROW - Recurring | Re-inspection required | TDOT-Routine Barricade Inspect - Traffic control is set according to plan. |