Permit: T21RW01057

Parcel: Unknown


Addresses:

1515 E DRACHMAN ST


Inspection Status: Re-inspection required

Inspection History: TRSP - ROW - Recurring

Permit Number - T21RW01057

Inspection Description - TRSP - ROW - Recurring

Inspection Status - Re-inspection required

Date Description Inspector Results Comments
06/23/2021 TRSP - ROW - Recurring Re-inspection required TDOT-EXCAV GENERAL INSPECTION - Drill max working pst 1530 permit time. Approval not given. Notified Dan Robertson. Backfilling trench with native and ab. Will be back tomorrow to rip out native and backfill per specs with ab and cold patch.
06/28/2021 TRSP - ROW - Recurring Re-inspection required TDOT-Routine Barricade Inspect - Traffic control devices removed from roadway, staged for set up/pickup.
06/23/2021 TRSP - ROW - Recurring Re-inspection required TDOT-EXCAV GENERAL INSPECTION - Vine street left a mess. No cold patch was placed. Type 2 barricade over AB in road way with no light. Drillmax did not sweep asphalt or clean site. Notified Brian Ripley stated the trailer broke down. Notified him no matter what cold patch must be placed on asphalt cut outs no exceptions. Had crew pull out of roadway until 0900 for traffic control set up per traffic control plans R2.
06/24/2021 TRSP - ROW - Recurring Re-inspection required TDOT-Routine Barricade Inspect - Traffic control is set according to plan.
06/22/2021 TRSP - ROW - Recurring Re-inspection required TDOT-EXCAV GENERAL INSPECTION - Drillmax boring for truenet. Bored north from drachman on vine and hand trenches alley and placed riser. Asked for permission to work until 1700. I gave the ok due to open trenches needing backfill. Notified them per plans time is 0900-1530 and starting 6/23 they must abide those times per the permit. Low traffic street.
06/23/2021 TRSP - ROW - Recurring Re-inspection required TDOT-Routine Barricade Inspect - Traffic control is set according to plan.
06/17/2021 TRSP - ROW - Recurring Re-inspection required TDOT-EXCAV GENERAL INSPECTION - Concrete poured for pole foundation. Slurry backfill placed in trenches a d around hand boxes. Site being cleaned up for day.
06/22/2021 TRSP - ROW - Recurring Re-inspection required TDOT-Routine Barricade Inspect - Traffic control is set according to plan.
06/16/2021 TRSP - ROW - Recurring Re-inspection required TDOT-EXCAV GENERAL INSPECTION - Drill max cold patched trench. Cleaning up debris by blower and sweeping. Material was visually inspected fence being placed for project ran by core.
06/17/2021 TRSP - ROW - Recurring Re-inspection required TDOT-Routine Barricade Inspect - Traffic control is set according to plan.
06/16/2021 TRSP - ROW - Recurring Re-inspection required TDOT-EXCAV GENERAL INSPECTION - Truenet hand digging for electrical run. Backfilling with AB and placing cold patch on top. Vertical one is vacuum trenching for pole caisson and hand boxes.
06/16/2021 TRSP - ROW - Recurring Re-inspection required TDOT-Routine Barricade Inspect - Traffic control is set according to plan.
06/15/2021 TRSP - ROW - Recurring Re-inspection required TDOT-EXCAV GENERAL INSPECTION - Drill max trenching for electrical run on drachman. AB on way to site for backfill and processing with compaction. Material was too tough to bore so went with trenching as alternate option
06/16/2021 TRSP - ROW - Recurring Re-inspection required TDOT-Routine Barricade Inspect - Traffic control is set according to plan.
06/14/2021 TRSP - ROW - Recurring Re-inspection required TDOT-EXCAV GENERAL INSPECTION - Drill max beginning bore for truenet. Drachman being bored to vine from pole location. Contractor was notified to not bore down vine until an approved traffic control plan is approved and set in place.
06/15/2021 TRSP - ROW - Recurring Re-inspection required TDOT-Routine Barricade Inspect - Traffic control is set according to plan.
08/13/2021 TRSP - ROW - Recurring Re-inspection required TDOT-EXCAV GENERAL INSPECTION - Asphalt restored. Pole placed color matched. Landscaping has been restored a d appears to be in accordance to plans. Site passes final ROW inspection.
07/22/2021 TRSP - ROW - Recurring Re-inspection required TDOT-EXCAV GENERAL INSPECTION - Pole ha been placed with light and color matched. All asphalt from bore has been hot patched per city standards. Landscaping has been restored. Site appears to pass ROW inspections according to plans. Notified Steve M of UA the project manager for site near SWF pole that work is completed until fiber run to pole.
07/22/2021 TRSP - ROW - Recurring Re-inspection required TDOT-EXCAV GENERAL INSPECTION - Magnum paving removing cold patch and compacting ab material dungaree. Permission was given for a 0630 start time and coordinated with core construction to not interfere with their work.
08/13/2021 TRSP - ROW - Recurring Re-inspection required TDOT-Routine Barricade Inspect - Traffic control devices have been removed from site.
07/16/2021 TRSP - ROW - Recurring Re-inspection required TDOT-EXCAV GENERAL INSPECTION - Met with Brian Ripley and vertical one. Trench that was cold patched must be replaced according to Steve m the project manager for UA. Measurements were made and Dan Livingston contacted for paving. Brian will schedule the pave and email confirmation.
07/22/2021 TRSP - ROW - Recurring Re-inspection required TDOT-Routine Barricade Inspect - Traffic control devices have been removed from site.
07/01/2021 TRSP - ROW - Recurring Re-inspection required TDOT-EXCAV GENERAL INSPECTION - Drill max repaired hot mix patches on drachman. Did not repair patch from trench in Peking area of project for core construction. Verizon wants to have a meeting with UA inspector about repair due to core ripping out the asphalt at a later date and replacing it.
07/22/2021 TRSP - ROW - Recurring Re-inspection required TDOT-Routine Barricade Inspect - Traffic control is set according to plan.
06/28/2021 TRSP - ROW - Recurring Re-inspection required TDOT-EXCAV GENERAL INSPECTION - Pole placed by vertical one. Asphalt on vine was hot patched by drill max. Roadway still needs to be pressure sprayed and cleaned.
07/16/2021 TRSP - ROW - Recurring Re-inspection required TDOT-Routine Barricade Inspect - Traffic control devices have been removed from site.
06/24/2021 TRSP - ROW - Recurring Re-inspection required TDOT-EXCAV GENERAL INSPECTION - Drill max cold patching trench. Will return tomorrow to put hot
Mix asphalt and finish final cleaning of site.
07/01/2021 TRSP - ROW - Recurring Re-inspection required TDOT-Routine Barricade Inspect - Traffic control devices removed from roadway, staged for set up/pickup.
06/02/2021 TRSP - ROW - Recurring Re-inspection required TDOT-EXCAV GENERAL INSPECTION - Pre con meeting. Remove old pole and replace with new pole. Bore down center roadway to one north on vine to alley west in alley to pole. Multiple under ground gas lines and water and sewage. Brian Ripley will contact electrician at sturgeon electric about electrical underground.
06/14/2021 TRSP - ROW - Recurring Re-inspection required TDOT-Routine Barricade Inspect - Traffic control is set according to plan.