Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you can not find what you are looking for please submit a records request.

Permit: T21RW00303

Parcel: 10308002H

Inspection Status: Re-inspection required

Inspection History: TRSP - ROW - Recurring

Permit Number - T21RW00303

Inspection Description - TRSP - ROW - Recurring

Inspection Status - Re-inspection required

Date Description Inspector Results Comments
08/17/2022 TRSP - ROW - Recurring Re-inspection required TDOT-EXCAV GENERAL INSPECTION - Underground water installation has been completed. Temporary asphalt patch still in roadway
03/29/2022 TRSP - ROW - Recurring Re-inspection required TDOT-EXCAV GENERAL INSPECTION - Underground waterworks have been installed. Moratorium repairs still needed. Contractor will repave Silverbell when neighborhood is paved
03/15/2022 TRSP - ROW - Recurring Re-inspection required TDOT-EXCAV GENERAL INSPECTION - All water crossings have been installed for new neighborhood. Moratorium pave still needed.Contractor will repave SilverBell when entrance to neighborhood has been paved
02/17/2022 TRSP - ROW - Recurring Re-inspection required TDOT-EXCAV GENERAL INSPECTION - Water crossings have been installed for new subdivision. Moratorium repair still needed. Moratorium repair will not be completed until after new entrance to subdivision has been installed
07/21/2021 TRSP - ROW - Recurring Re-inspection required TDOT-EXCAV GENERAL INSPECTION - Underground water has been installed. Temporary asphalt patch across roadway. I talked with Lorenzo from Dirtworks who stated they will do the moratorium pave when the new subdivision gets paved. I informed Lorenzo that will be a while and to maintain the permit.
03/09/2021 TRSP - ROW - Recurring Re-inspection required TDOT-EXCAV GENERAL INSPECTION - What a work in progress. No issues with barricades set up. Flagman in use. Pipe installation going slow.
03/04/2021 TRSP - ROW - Recurring Re-inspection required TDOT-EXCAV GENERAL INSPECTION - Correction Required - Call-out for failing plates in roadway. Dirtworks and Trafficade arrived to divert traffic around Hazard. Will backfill and re-plate 3/4.
02/22/2021 TRSP - ROW - Recurring Re-inspection required TDOT-EXCAV GENERAL INSPECTION - Continued - Project on hold. Encountered concrete encased Fiber Optic line. Need redesign approved by Tucson Water. Dirtworks to place bump signs at plated excavation.
01/05/2023 TRSP - ROW - Recurring Complete (Recurring)
02/02/2021 TRSP - ROW - Recurring Re-inspection required TDOT-EXCAV GENERAL INSPECTION - Continued - Meeting to discuss water crossings on Silverbell. Road under pavement moratorium. Plates to be milled in. Flagger setup with speed reduction. Preconstruction checklist sent to Tyler at Dirt Works. Waiting on conformation from Archeologist Jodie Brown before proceeding.
02/22/2021 TRSP - ROW - Recurring Re-inspection required TDOT-Routine Barricade Inspect - Traffic control devices have been removed from site.
04/17/2024 TRSP - ROW - Recurring Re-inspection required