Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you can not find what you are looking for please submit a records request.
Inspection History Details
Inspection Status: Passed
Inspection History: TRSP - PIA - Engineering Final - Completion of PIA Work (Final Lot Release/Acceptance)
Plan Number - T21PI00008
Inspection Description - TRSP - PIA - Engineering Final - Completion of PIA Work (Final Lot Release/Acceptance)
Inspection Status - Passed
Date | Description | Inspector | Results | Comments |
---|---|---|---|---|
10/24/2023 | TRSP - PIA - Engineering Final - Completion of PIA Work (Final Lot Release/Acceptance) | Passed | ||
12/01/2023 | TRSP - PIA - Engineering Final - Completion of PIA Work (Final Lot Release/Acceptance) | Re-inspection required | please see notes under photos attached. | |
12/05/2024 | TRSP - PIA - Engineering Final - Completion of PIA Work (Final Lot Release/Acceptance) | Re-inspection required | This inspection was the punchlist walk where multiple areas were deemed in need of replacement or repair due to damage or lack of attention before the one-year warranty period lapses. A detailed list with some exemplar images has been uploaded to the file. |