Inspection History Details
Case: T21PI00006
Parcel: 14036005F
Inspection Status: Passed
Inspection History: TRSP – PIA - Engineering Final – Completion of PIA Work (Final Lot Release/Acceptance)
Plan Number - T21PI00006
Inspection Description - TRSP – PIA - Engineering Final – Completion of PIA Work (Final Lot Release/Acceptance)
Inspection Status - Passed
Date | Description | Inspector | Results | Comments |
---|---|---|---|---|
02/26/2024 | TRSP – PIA - Engineering Final – Completion of PIA Work (Final Lot Release/Acceptance) | Passed | punch list completed. site passes final inspection. | |
08/04/2023 | TRSP – PIA - Engineering Final – Completion of PIA Work (Final Lot Release/Acceptance) | Re-inspection required | punch list with contractor still has pending items to complete. |