Date Description Inspector Results Comments
10/27/2022 COT - ENGR - Signage Final Not Ready
10/20/2022 COT - ENGR - Signage Final hthrall Approved Entered by HTHRALL1 - Still waiting for payment to issue the sign permit
09/07/2022 COT - ENGR - Signage Final Hthrall Approved Entered by HTHRALL1 - Revised plan set shows 20' setback off of MLK Way (private street) and 20' setback off of Kino. Approved.
07/14/2022 COT - ENGR - Signage Final hthrall1 Continued Entered by HTHRALL1 - site plan discussion for location of monument 6 and 5 / Nohe Garcia of Bourn inquiring.
02/28/2022 COT - ENGR - Signage Final hthrall1 Continued Entered by HTHRALL1 - SDRC CASE MSP-22-02 APPROVED / T22SA00048 - INCREASED SIGN AREA FROM 50 TO 60 SQFT AND ALLOW 1 SIGN ON LOCAL STREET AND RETAIN ALLOWANCE FOR 3 ON KINO BETWEEN TUCSON MARKETPLACE AND SOUTHERN LOT LINE OF SUB-AREA B-III. APPEAL PERIOD ENDS 3/14/22. NEEDS REVISED CONSTRUCTION DRAWINGS AND SITE PLAN TO SHOW SIGN ON PRIVATE PROPERTY OR T.R.E. TO BE IN RIGHT OF WAY - OR SHOW IT'S IN PRIVATE RIGHT OF WAY AREA. THIS SIGN IS KNOWN AS "MONUMENT 6", AND IT IS TO BE AT THE NORTHERN SIDE OF MLK WAY AND KINO.
11/10/2021 COT - ENGR - Signage Final Hthrall Continued Entered by HTHRALL1 - RE: monument sign review For: Tucson Marketplace at the Bridges AT: 1500 E Tucson Marketplace (Kino, at MLK on Lot 10 proximity) Permit: T21OT00829 Reviewer: H. Thrall Date: 11/10/21 Codes: Unified Development Code (UDC 7A, Sign Standards), National Electrical Code (NEC), Tucson-Pima County Outdoor Lighting Code (OLC), International Building Code (IBC) 2018 1) Sign area exceeds allowance for a monument sign (max of 50 sqft). In addition, the bottom text needs to be included (box it). Suggest reducing cabinet height to 8' tall to allow for change from a monument to a low-profile sign category, which allows for 60 sqft sign area. Be sure though, that 2' solid base without text is provided under the full length of this sign cabinet design. The alternative is to shorten the length of the cabinet and ensure that when the bottom letters are boxed, that they do not exceed a cumulative sign display area on the structure of 50 square feet. (The similar sign on Park was a pole sign category. This site already has that. If additional pole signs are desired, a Sign Design Review Committee process applies.) 2) Acknowledged sheet 2 has a 30' setback noted. Site plan sheet, show setback from Kino street curb and MLK Way to closest leading edge of sign. b) Please note - the setback for a monument is 20', setback for a low-profile sign can be 16' from curb, providing sign is out of SVT and behind walking path, and on private property. (Overall location map shows development activity in this area. If this lot is under development and has an approved development plan sheet, put sign on that sheet for the site review in relation to driveways (2' setback needed) and parking (18" setback from parking spaces) and any easements, etc. Thank you. c) Take sign setbacks from furthest edge of street curbs. d) Clarify whether slopes applicable, as shown in elevation view. 3) Sign at corner is bisecting the corner and counts as two monuments. If desired to relocate to be one monument, simply move to one side of bisection line. (To bisect corner, take straight line out from both street curbs and where these lines meet, cut in exact half for each street front. Show bisection line on plan and sign proximity to that line.) 4) Sign is shown in what appears to be city right of way - clarify, or relocate perhaps slightly north. If in city right of way, needs a temporary revocable easement (TRE). If on private street juncture, specifically call out the proximity to both city and private. 5) NEC / OLC: a) Add note to timer that shut off curfew is midnight. b) Add note that all lighting is internal (is the decorative component lit? and is bottom "the Bridges" lettering lit? just add clarifying notes as needed, please) 6) IBC: a) Is side décor framework all one piece with bottom blue component? If so, add note. If not, add bolts to sign cabinet (I see in engineering plan of top view and side view where this decorative piece bolts to base, thank you.) b) Just add note clarifying all welds are shop welds. (Understood in engineering that bolting used for attachment mounts) Please revise and resubmit by email to to Heather.Thrall@tucsonaz.gov