Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO.
If you cannot find what you are looking for please
submit a records request.
Inspection Status: Passed
Inspection History: COT - ENGR - Signage Final
| Date |
Description |
Inspector |
Results |
Comments |
| 08/19/2021 |
COT - ENGR - Signage Final |
Hthrall |
Approved |
Entered by HTHRALL1 - Your sign package has been authorized for a self-certification inspection. (8 or less signs, and all attached to a building)
Either schedule 09830 as a remote video inspection by leaving your date desired, and then include in the message your phone number and email address
OR
Email PDSDsigninspections@tucsonaz.gov
pictures of the following items to conduct the self-certification inspection:
Elevation view of installed signs to match approved plans
Angled pic of sign lettering to contain the UL sticker in install sticker
Shut off switch
labeled breaker panel - clearly ID signs, ID business location in pic
breaker panel switches in "on" position for signs
Pic of timer - ID shut off time set to, and ID business location in pic
Note that a lock out may be required, depending on location of shut off and location of sign.
|
| 08/19/2021 |
COT - ENGR - Signage Final |
Hthrall |
Approved |
Entered by HTHRALL1 - Revision received 08/19/21 and approved. |
| 08/16/2021 |
COT - ENGR - Signage Final |
Hthrall |
Continued |
Entered by HTHRALL1 - RE: canopy sign review
For: 2500 E Grant Rd / 5.5. Nail Bar
Sign permit: T21OT00582
Date: 08/16/21
Reviewer: H. Thrall
Codes: National Electrical Code (NEC), Tucson-Pima County Outdoor Lighting Code (OLC), International Building Code (IBC) 2018, Unified Development Code (UDC) Sign Standards 7A
1) Provide property management written approval.
2) Provide photo showing parapet system on roof top and that each sign A and Sign B will not be roof signs - or provide note that parapet roof system has been installed and sign lettering shall not exceed that parapet height. (acknowledged Master Sign Program 19-06 approval for allowed sign area / letter height
3) Revise diagram set to call out which sign is on what elevation - east / west - as shoud be noted on bottom left of diagram.
4) OLC - maximum color temperature is 4400k, drawing indicates 4500k (see right side of diagram, sheet 2). Revise.
5) Add note, "no on site welds" for signs A & B
6) Add note clarifying how sign C is installed to the undercanopy.
Send revisions to Heather.Thrall@tucsonaz.gov |
| 09/01/2021 |
COT - ENGR - Signage Final |
Hthrall |
Continued |
Entered by HTHRALL1 - Your sign package has been authorized for a self-certification inspection. (8 or less signs, and all attached to a building)
Either schedule 09830 as a remote video inspection by leaving your date desired, and then include in the message your phone number and email address
OR
Email PDSDsigninspections@tucsonaz.gov
pictures of the following items to conduct the self-certification inspection:
Elevation view of installed signs to match approved plans
Angled pic of sign lettering to contain the UL sticker in install sticker
Shut off switch
labeled breaker panel - clearly ID signs, ID business location in pic
breaker panel switches in "on" position for signs
Pic of timer - ID shut off time set to, and ID business location in pic
Note that a lock out may be required, depending on location of shut off and location of sign.
|