Inspection History Details
Inspection Status: Approved
Inspection History: SIGN SELF CERTIFICATION INSP
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 01/28/2022 | SIGN SELF CERTIFICATION INSP | Approved | Sign contractor emailed photos 1/7/22 of the completed work matching the approved plans for Cold Stone Creamery's signs (variance S-08-22). The photos show elevation views of both signs, side view with manufacturer, UL and sign contractor stickers, shut off switch, timer set, labeled breaker panel with designated circuit. Approved. H. Thrall | |
| 06/15/2021 | SIGN SELF CERTIFICATION INSP | Continued | Your sign package has been authorized for a self-certification inspection. (8 or less signs, and all attached to a building) Either schedule 09830 as a remote video inspection by leaving your date desired, and then include in the message your phone number and email address OR Email PDSDsigninspections@tucsonaz.gov pictures of the following items to conduct the self-certification inspection: Elevation view of installed signs to match approved plans Angled pic of sign lettering to contain the UL sticker in install sticker Shut off switch labeled breaker panel - clearly ID signs, ID business location in pic breaker panel switches in "on" position for signs Pic of timer - ID shut off time set to, and ID business location in pic Note that a lock out may be required, depending on location of shut off and location of sign. |