Inspection Status: Not Ready
Inspection History: COT - ENGR - Signage Final
| Date |
Description |
Inspector |
Results |
Comments |
| 10/27/2022 |
COT - ENGR - Signage Final |
|
Not Ready |
|
| 10/27/2022 |
COT - ENGR - Signage Final |
|
Not Ready |
|
| 01/24/2022 |
COT - ENGR - Signage Final |
bwiese1 |
Not ready for Inspection |
Entered by BWIESE1 - Contractor needs more time |
| 05/07/2021 |
COT - ENGR - Signage Final |
Hthrall |
Approved |
Entered by HTHRALL1 - RE: wall sign review
For: 8600 E Speedway / A -family Storage
Sign permit: T21OT00362
Reviewer: H. Thrall
Date: 5/7/21
Permit status: approved
Codes: Unified Development Code (UDC) Sign Standards 7A, National Electrical Code (NEC 600), Tucson Pima County Outdoor Lighting Code (OLC), International Building Code (IBC 2018).
1) NEC / OLC
A) add note on location of timer for inspections (i.e. in office at breaker panel)
B) label disconnect switch (I see power supply, provide distinction for disconnect/shut off)
send updated set to Heather.Thrall@tucsonaz.gov for stamping |
| 01/04/2023 |
COT - ENGR - Signage Final |
|
Passed |
|
| 01/04/2023 |
COT - ENGR - Signage Final |
|
Passed |
Past! Approved! Completed! Done! |
| 07/03/2023 |
COT - ENGR - Signage Final |
|
Passed |
|
| 07/03/2023 |
COT - ENGR - Signage Final |
|
Passed |
|