Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you can not find what you are looking for please submit a records request.
Inspection History Details
Inspection Status: Not Ready
Inspection History: COT - ENGR - Sign Electrical
Permit Number - T21OT00175
Inspection Description - COT - ENGR - Sign Electrical
Inspection Status - Not Ready
Date | Description | Inspector | Results | Comments |
---|---|---|---|---|
10/27/2022 | COT - ENGR - Sign Electrical | Not Ready | ||
03/22/2022 | COT - ENGR - Sign Electrical | DROBERTS | Partial Approval | Entered by VVERA1 - IS PARTIAL, SEE THE ABOVE NOTES FOR ELECTRICAL ITEMS. |
11/02/2021 | COT - ENGR - Sign Electrical | DROBERTS | Not ready for Inspection | Entered by NGARCIA3 - SIGN ELECTRIC IS NOT READY AT THIS TIME. I WILL NEED PHOTOGRAPHS OF THE FUSE BOX WITH A DESIGNATED 20 AMP FUSE, A TIMER FOR THIS SIGN, AND A LOCKOUT SWITCH EITHER ON THE SIGN OR IN THE ELECTRICAL ROOM. ALSO A PHOTO CELL IS ON THIS SIGN TO CONTROL THE OPERATIONAL TIME, THIS IS NOT ALLOWED, PROVIDE A TIMER IN THE ELECTRICAL ROOM. |
10/25/2021 | COT - ENGR - Sign Electrical | DROBERTS | Continued | Entered by NGARCIA3 - CONTINUED, WILL BE RESCHEDULED FOR 10/27/2021 IN THE AM ALONG WITH ALL OTHERS. |