Inspection History Details
Inspection Status: Approved
Inspection History: SIGN SITE REVIEW
Permit Number - T21OT00096
Inspection Description - SIGN SITE REVIEW
Inspection Status - Approved
Date | Description | Inspector | Results | Comments |
---|---|---|---|---|
03/01/2021 | SIGN SITE REVIEW | Approved | Rio Nuevo approval letter provided by Architect. (PAD-5 zone) Monument sign is subject to requirements of TRE 2021-106 for use of right of way Reminder - sign may be 12' tall in pedestrian district. No on site welds. |
|
02/26/2021 | SIGN SITE REVIEW | Approved | All plans approved. Awaiting Rio Nuevo approval and TRE data. |
|
02/19/2021 | SIGN SITE REVIEW | Approved | SVT dimensions needed on diagram for final plan approval. Sign is 20' setback and needs TRE. TRE nearly complete, per RE Division at DTM. Rio Nuevo sign approval per PAD zoning criteria was requested, has not been provided - likely seen with overall package of development. Needs engineering to match category II risk wind velocity, use pages 5 & 6 engineering from matching sign at hotel adjacent, which has 115 mph wind load used rather than 95mph - per Eric Newcomb. |
|
02/11/2021 | SIGN SITE REVIEW | Approved | Needs SVT - and taken from back of parking lane on Church. Structural / electrical / outdoor lighting and |
|
02/08/2021 | SIGN SITE REVIEW | Continued | Setback and SVTs needed on plans, as well as engineering data. Informed contractor. |