Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO.
If you cannot find what you are looking for please
submit a records request.
Inspection Status: Complete (Recurring)
Inspection History: SPECIAL INSPECTION - Sign Footing (Third Party)
| Date |
Description |
Inspector |
Results |
Comments |
| 11/17/2021 |
SPECIAL INSPECTION - Sign Footing (Third Party)
|
Hthrall |
Continued |
Entered by HTHRALL1 - Site inspection for footer depth and diameter per engineered plans. Check location / setback, general grade.
Inspector - special inspector required for concrete pour.
Special inspections required for field welding.
Special inspections required for final height verification of 48' max height from freeway travel lane grade to top of sign cabinet (excludes embellishment).
|