Inspection History Details
Inspection Status: Approved
Inspection History: SIGN INSPECTION
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 09/14/2021 | SIGN INSPECTION | Approved | RECEIVED SPECIAL INSPECTION FORM AND REPORTS FOR FIELD WELDS TO POLE SIGN STRUCTURE. THESE WERE CONDUCTED BY WESTERN TECH AND SEALED BY RANDALL HARRIS, P.E. - SIGNED BY H.THRALL AND UPLOADED ONLINE. NEED ELECTRICAL FUSE BOX PICS TO FINAL - EMAILED CONTRACTOR 09/14/21. |
|
| 08/26/2021 | SIGN INSPECTION | Approved | ||
| 08/18/2021 | SIGN INSPECTION | Partial Approval | PARTIAL CANNOT GET IN THE ELECTRICAL BOX. |