Inspection History Details
Inspection Status: Approved
Inspection History: FIRE SPKLR - FINAL
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 08/01/2022 | FIRE SPKLR - FINAL | Approved | ||
| 06/27/2022 | FIRE SPKLR - FINAL | Cancelled | 1. need to have sprinkler contractor on site when calling in this inspection. | |
| 03/23/2022 | FIRE SPKLR - FINAL | Partial Approval | 1. partial approval first floor north portion | |
| 03/23/2022 | FIRE SPKLR - FINAL | Partial Approval | 1. Need as-builts | |
| 01/26/2022 | FIRE SPKLR - FINAL | Not ready for Inspection | This is inspection one of two. 1. walked the first floor it just needs to be trimmed out. 2. there are ceiling fan outlets installed in the ceiling. Its unknown if fans will be installed at this time. If fans are installed heads will need to be relocated and an additional head will need to be added to each room. |